• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, August 13, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply

KI News by KI News
August 1, 2024
in CITY & TOWNS, LOCAL
A A
0
Power connection mandatory for under-construction buildings: KPDCL
FacebookTwitterWhatsapp

SRINAGAR: To protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited (KPDCL) is installing 40,000 DT meters & 1400 feeder meters under the premier loss reduction scheme of RDSS.

This shall be besides 6.85 lakh consumer smart meters which shall be installed in unmetered flat-rate areas as well those areas where conventional meters have been installed in Kashmir Division over the next 27 months.

Related posts

CM Omar Abdullah reviews Dairy Infrastructure Scheme; underscores J&K’s immense dairy potential

CM Omar Abdullah reviews Dairy Infrastructure Scheme; underscores J&K’s immense dairy potential

August 12, 2025
ACB registers case in land records tampering matter

ACB registers case in land records tampering matter

August 12, 2025

Giving details in a press release issued here today, a KPDCL spokesperson stated that DT & Feeder metering shall facilitate real-time monitoring of the electrical system, paving way for reliable power supply to the consumers by way of remote monitoring of load and voltage unbalancing. “Installation of feeder meters shall help us in better load forecasting and relay information regarding duration and interruptions in electricity supply in digital mode,” he added.

340 feeders have already been integrated with the National Feeder Monitoring System (NFMS) while the rest of the feeders will be covered under RDSS.

In a big relief to domestic consumers, living in flat-rate areas and areas where conventional/ non-communicating meters are installed, to cut down on their consumer bills, Kashmir DISCOM is set to install 6.85 lakh smart meters under RDSS to give the option of digital monitoring of their consumption and daily billing trajectory to the consumers. “All these smart meters will be prepaid-enabled and will provide more accurate and real-time consumption details, ushering in a new era of uninterrupted and quality power supply,” he said, adding consumers will be able to check energy consumed on their mobile phones.

KPDCL spokesman further stated that the executing agency is in process of formulation of Project Implementation Plan for smart metering in uncovered areas. “Already under PMDP, over 3.00 lakh smart meters have been installed with nearly 1.20 lakh meters operating in prepaid mode, allowing consumers to monitor their daily consumption and billing options,” he added.

Previous Post

S P Tiwari calls on Lt Governor

Next Post

Secy Planning holds extensive deliberations with WB team on JTFRP works

KI News

KI News

Next Post
Expedite completion of new Orthopaedic Unit at B&J Hospital: Aijaz Asad

Secy Planning holds extensive deliberations with WB team on JTFRP works

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.