• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, November 26, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

“Another milestone”: ISRO rocket accomplishes zero orbital debris mission

Press Trust of india by Press Trust of india
March 26, 2024
in TOP NEWS
A A
0
ISRO announces Young Scientist Prog-2024
FacebookTwitterWhatsapp

Bengaluru: ISRO on Monday said its Polar Satellite Launch Vehicle (PSLV) has accomplished zero orbital debris mission, and described it “another milestone”.

This was achieved on March 21, when the PSLV Orbital Experimental Module-3 (POEM-3) met its “fiery end” through a re-entry into the Earth’s atmosphere.

More News

Cold wave conditions intensify in Kashmir valley

J&K HC dismisses bail plea of two NDPS detainees

CM Omar Abdullah seeks fast-tracking of pending Revenue Dept works

Load More

“The PSLV-C58/XPoSat mission has practically left zero debris in orbit,” the space agency said.

The PSLV-C58 mission was accomplished on January 1.

According to ISRO, after completing the primary mission of injecting all satellites into their desired orbits, the terminal stage of PSLV was transformed into a 3-axis stabilised platform, the POEM-3.

The stage was deorbited from 650 km to 350 km, which facilitated its early re-entry, and was passivated to remove residual propellants to minimise any accidental break-up risks, it said.

POEM-3 was configured with a total of nine different experimental payloads to carry out technology demonstrations and scientific experiments on the newly developed indigenous systems. Out of these, six payloads were delivered by Non-Government Entities (NGEs) through Indian National Space Promotion and Authorization Centre (IN’?SPACe).

The mission objectives of these payloads were met in a month.

The orbital altitude of the upper stage continued to decay under the influence of natural forces, primarily atmospheric drag with the module (NORAD ID 58695) expected to have impacted the North Pacific Ocean (Lat 6.4 N & Long 158.7 W) on March 21, 2024, at 14:04 UTC (19:34 Hrs. IST), ISRO said.

Through the POEM, which serves as a very cost-effective platform for carrying out short-duration space-borne experiments, ISRO has opened up new vistas for academia, startups, and NGEs to experiment with their new payloads, it said.

This novel opportunity has been effectively utilised by numerous startups, universities, and NGEs for carrying out experiments in space, which included electric thrusters, satellite dispensers, and star-tracking.

POEM also incorporates new features such as total avionics in single-chain configuration, industrial-grade components in avionics packages including Mission Management Computer, standard interfaces for electric power, telemetry & telecommand, and new in-orbit navigation algorithms making use of rate-gyro, sun sensor, and magnetometer, the space agency said.

For the effective conduct of experiments onboard in POEM-3, the body rates were stabilised to less than 0.5 deg/s throughout, and innovative schemes like controlled dumping of residual propellant after the main mission were introduced for minimizing disturbances due to passivation, it added.

Noting that the Vikram Sarabhai Space Centre (VSSC) has taken the lead in conceptualising and realising the POEM by augmenting the 4th stage of PSLV, ISRO said PSLV-C58/XPoSat is the third such mission in the series, with POEMs being successfully scripted each time.

The payload operations were carried out effectively by the spacecraft operations team from the mission operations complex (MOX) at ISRO Telemetry Tracking and Command Network (ISTRAC) and ISRO’s System for Safe and Sustainable Spacecraft Operations Management (IS4OM) has been monitoring and analysing the orbital decay all through, it said. Till near re-entry, POEM-3 was tracked by ISTRAC ground stations.

The Multi-Object Tracking Radar (MOTR) at Shriharikota also tracked the PS4 stage till the morning of March 21. POEM-3 was also supported by other Centres like U R Rao Satellite Centre (URSC), Liquid Propulsion Systems Centre (LPSC) and ISRO Inertial Systems Unit (IISU).

ISRO said it will continue its commitment to providing a cost-effective orbital experiment platform, as the growing menace due to space debris, especially with multiple small satellite constellations coming up, poses a significant threat to space activities, including satellite launches, human spaceflight, and space exploration missions.

ISRO, being a responsible space agency, is committed to mitigating this threat through the development and implementation of advanced debris tracking systems, space-object deorbiting technologies, and responsible satellite deployment practices, thus safeguarding orbital environments for present and future space endeavors, it added.

Previous Post

27 detained in Jammu for consuming alcohol at public places on Holi

Next Post

PDD employees stage silent protest in Sgr

Press Trust of india

Press Trust of india

Related Posts

Cold wave conditions intensify in Kashmir valley

Temperatures dip across Kashmir, many towns record coldest night in 16 years
by KI News
November 26, 2025

Srinagar: The cold wave in Kashmir intensified as the minimum temperature across the valley stayed several degrees below the freezing...

Read moreDetails

J&K HC dismisses bail plea of two NDPS detainees

PM Modi inaugurating incomplete projects for votes: JKPCC
by Images News Netwok
November 26, 2025

Srinagar: The High Court of J&K and Ladakh, while dismissing the bail plea of two “drug peddlers”, has held that...

Read moreDetails

CM Omar Abdullah seeks fast-tracking of pending Revenue Dept works

CM Omar Abdullah seeks fast-tracking of pending Revenue Dept works
by Images News Netwok
November 26, 2025

Jammu: Chief Minister Omar Abdullah today chaired a meeting at the Civil Secretariat to review the progress of infrastructure projects...

Read moreDetails

38 master craftsmen receive UT-level awards from Dy CM

38 master craftsmen receive UT-level awards from Dy CM
by KI News
November 26, 2025

SRINAGAR: Deputy Chief Minister, Surinder Choudhary, today honoured 38 outstanding craftsmen and artisans with the UT-Level Artisan and Weaver Awards–2024...

Read moreDetails

Police probe ‘tax evasion’ by two educational institutes in Baramulla

Authorities in J&K probe ‘radicalisation’ of youths especially girls in Kashmir schools
by KI News
November 26, 2025

Srinagar: Police have initiated a probe into the alleged tax evasion and Foreign Contribution (Regulation) Act (FCRA) irregularities by two...

Read moreDetails

CBK chargesheets four in Rs 1.66 crore property scam

Police produces chargesheet in Bemina terrorist attack case
by KI News
November 26, 2025

Srinagar: The Economic Offences Wing of Crime Branch Kashmir on Tuesday said that it filed a chargesheet before the Court...

Read moreDetails
Next Post
KI News

PDD employees stage silent protest in Sgr

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.