• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, May 18, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

40% work on Zojila tunnel over; terrain, weather challenges push completion deadline to 2030

Press Trust of india by Press Trust of india
July 31, 2023
in TOP NEWS
A A
0
Work on Z-Morh, Zojila tunnels will be completed ahead of schedule: NHIDCL
FacebookTwitterWhatsapp

Drass: Difficult terrain and weather challenges have pushed the deadline for completion of the Zojila tunnel, which will provide all-weather connectivity between the Kashmir Valley and the Ladakh region, to December 2030, according to officials.

The tunnel, said to be the longest of its kind in Asia and at the highest altitude, will significantly cut down the time to cross the Zojila pass from four hours to just 15 minutes, they said.

More News

LG urges citizens to self-enumerate their household details

Lashkar terrorist goes for hair transplant after infiltrating J&K

Eid-ul-Adha on May 27

Load More

Officials said that while 40 percent of work on the 13-km-long tunnel is already over, the challenges posed by the terrain and weather are such that the rest of the work is taking so much time.

“The area is severely avalanche-prone. The work had to be stopped multiple times due to the difficulties posed by the weather and the terrain. The tunnel was to be completed by December 2026. But now, keeping the challenges in mind, the deadline has been revised to December 2030,” Captain IK Singh of the Border Roads Organisation said.

The tunnel project through the Zojila Pass at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National Highway is of strategic importance.

The highway remains closed during winter due to heavy snowfall, cutting off the Ladakh region from Kashmir. The tunnel will help overcome this hindrance and prove all-weather connectivity to the Ladakh region.

The single-tube Zojila tunnel, from Baltal in the Ganderbal district of central Kashmir to Minimarg in Drass town of Ladakh’s Kargil district, has an approach road of 18 km.

“The total length of the project from Sonamarg to Minimarg is 31 km. From Sonamarg to Baltal it is 18 km. Then the main tunnel starts from Baltal and goes to Minimarg. It is 13 km long. The work is going on at a rapid pace on both the projects,” Imtiaz Ahmed, the construction manager of Megha Engineering and Infrastructure Limited said.

MEIL is constructing the tunnel using the new Austrian tunnelling method.

“By using this method, the chances of accidents are very low while the quality and the speed are very high. This technology is applied in Europe and North America,” he explained.

Ahmed said out of the 13-km stretch, cutting has been done on 6 km — three km from each end. The stretch remains closed for over four months during winter due to excessive snowfall.

“It not only causes problems for the locals and tourists, but military movement also becomes a challenge during those four months. It is easier to clear snow on the stretch from Drass to Minamarg. However, from Minamarg to Baltal it is very difficult to even clear snow during those months… All these challenges will be addressed once the tunnel is operational,” he said.

Prime Minister Narendra Modi laid the foundation stone for the Zojilla tunnel in 2018. The Cabinet Committee on Economic Affairs, chaired by the prime minister, had approved the construction, operation and maintenance of this tunnel at a total cost of Rs 6,800 crore.

Previous Post

Eighth persons arrested for April attack on police party

Next Post

Man dies after complaining chest pain in police lockup in Udhampur; inquiry ordered

Press Trust of india

Press Trust of india

Related Posts

LG urges citizens to self-enumerate their household details

LG urges citizens to self-enumerate their household details
May 18, 2026

Srinagar: The Lieutenant Governor Manoj Sinha completed his self-enumeration today, marking the beginning of the House listing and Housing Census...

Read moreDetails

Lashkar terrorist goes for hair transplant after infiltrating J&K

Lashkar terrorist goes for hair transplant after infiltrating J&K
May 18, 2026

Srinagar: Infiltrating Jammu and Kashmir to execute terror attacks for the banned Lashkar-e-Taiba (LeT), a Pakistani terrorist paused his operations...

Read moreDetails

Eid-ul-Adha on May 27

Ramzan to begin on March 2 across J&K: Mufti Nasir-ul-Islam
May 18, 2026

Srinagar: Grand Mufti of Jammu and Kashmir Nasir-ul-Islam Farooq on Sunday announced that Eid-ul-Adha will be celebrated across Jammu and...

Read moreDetails

Mainstreaming of J&K under Modi govt led to aspirational surge among women: Jitendra Singh

Mainstreaming of J&K under Modi govt led to aspirational surge among women: Jitendra Singh
May 18, 2026

Srinagar: Union Minister Jitendra Singh on Sunday said the mainstreaming of Jammu and Kashmir under the leadership of Prime Minister...

Read moreDetails

DFCO issues advisory ahead of nationwide chemists’ bandh on May 20

Tral shuts for second day against militant killings
May 18, 2026

Srinagar: Drugs and Food Control Organization on Sunday issued a public advisory ahead of the nationwide bandh call given by...

Read moreDetails

Govt withholds salaries of four ACDs over poor MGNREGA performance

AC extends Amnesty Scheme-2022 for domestic consumers of electricity till March 2025
May 18, 2026

Srinagar: The Jammu and Kashmir government has withheld the salaries of four Additional District Programme Coordinators (ADPCs)/Assistant Commissioners Development (ACDs)...

Read moreDetails
Next Post
26 charred to death in China as tour bus catches fire

Man dies after complaining chest pain in police lockup in Udhampur; inquiry ordered

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.