• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, February 5, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Mounting on a trolly, Railway Minister inspects world’s highest railway bridge

Press Trust of india by Press Trust of india
March 27, 2023
in TOP NEWS
A A
0
Mounting on a trolly, Railway Minister inspects world’s highest railway bridge
FacebookTwitterWhatsapp

Jammu: Railway Minister Ashwini Vaishnaw on Sunday made the first inspection of the world’s highest railway bridge at Bakkal-Kauri over river Chenab in Reasi.

Addressing media persons at the first run of a track-mounted trolley, he said the USBRL project will be completed by December this year or January 2024.

More News

Two terrorists killed in Udhampur, one in Kishtwar

No end to encounters even in 2026: CM’s jibe at BJP over its 2019 claims on ending terrorism

CM Abdullah introduces Jan Vishwas, anti-discrimination bills in J-K Assembly

Load More

Vaishnaw traveled on the track-mounted trolley with railway officials and inspected the iconic bridge having a height of 359 metres from the Chenab riverbed.

The iconic bridge having a foundation equal to half the football field is a “subject of pride” and it was “a difficult challenge of engineering”, he said, adding that more than 28,000 metric tonnes of steel was used for the bridge structure that is built in a highly active seismic zone.

The Northern Railway officials said the arch bridge was constructed at a cost of Rs 1,486 crore.

The deck height of the bridge is 359 metres, while its length is 1,315 metres. The arch bridge has 17 spans and the linear length of the main arch span is 460 metres and it is curvilinear, they said.

The codal life of the bridge is 120 years and the bridge can withstand the wind speed of 266 kmph, but the train can cross the bridge at the speed of 100 kmph.

While talking to media persons, the Minister reiterated that Vande Bharat Metro train will be operated between Jammu and Srinagar in Jammu and Kashmir once the Udhampur-Srinagar-Baramulla Rail Link Project (USBRL) becomes fully operational.

Vaishnaw said it has been decided to set up a Vande Bharat Express train maintenance facility at Budgam in the Kashmir Valley and in the first go Vande Bharat Metro will be run between Jammu and Srinagar cities once this important railway link, which will connect the Kashmir Valley with the rest of the country through rail network gets completed.

Previous Post

Areas neglected earlier role model for country now: Jitendra Singh

Next Post

Registrar of Companies strikes off 400 companies in J&K

Press Trust of india

Press Trust of india

Related Posts

Two terrorists killed in Udhampur, one in Kishtwar

Two terrorists killed, 5 security personnel injured in encounter in Kulgam
February 5, 2026

Jammu: Two terrorists were killed in Udhampur and one in Kishtwar during two separate encounters marking a major success for...

Read moreDetails

No end to encounters even in 2026: CM’s jibe at BJP over its 2019 claims on ending terrorism

IWT caused long-term harm to J&K, suspension will restore water rights: CM Omar Abdullah
February 5, 2026

Jammu: Encounters are taking place even in 2026, Jammu and Kashmir Chief Minister Omar Abdullah said on Wednesday in a...

Read moreDetails

CM Abdullah introduces Jan Vishwas, anti-discrimination bills in J-K Assembly

CM Abdullah introduces Jan Vishwas, anti-discrimination bills in J-K Assembly
February 5, 2026

Jammu: Jammu and Kashmir Chief Minister Omar Abdullah on Wednesday introduced two key bills -- the Jan Vishwas and an...

Read moreDetails

Budget Session 2026: Discussion on Motion of Thanks continues for second day

Budget Session 2026: Discussion on Motion of Thanks continues for second day
February 5, 2026

Jammu: The discussion on the Motion of Thanks to the Lieutenant Governor’s Address continued for the second consecutive day in...

Read moreDetails

‘Centre to fund 90% of PMGSY IV projects in J&K’: Dy CM

DPR for Keran-Jumgund tunnel to be prepared, taken up with MoRTH: Dy CM
February 5, 2026

JAMMU: Deputy Chief Minister Surinder Choudhary today said that the government will expedite the forest clearance for the speedy execution...

Read moreDetails

BJP legislators stage dharna outside Assembly, accuse Speaker of bias in allotting time

BJP legislators stage dharna outside Assembly, accuse Speaker of bias in allotting time
February 5, 2026

Jammu: BJP legislators on Wednesday staged a dharna outside the Jammu and Kashmir Assembly after staging a walkout from the...

Read moreDetails
Next Post
Registrar of Companies strikes off 400 companies in J&K

Registrar of Companies strikes off 400 companies in J&K

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.