• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, August 28, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

First electric train on Bla-Banihal corridor to run from October 2

Images News Netwok by Images News Netwok
September 14, 2022
in TOP NEWS
A A
0
First electric train on Bla-Banihal corridor to run from October 2
FacebookTwitterWhatsapp

Srinagar: Electric train for 137-kilometer long Baramulla-Banihal railway corridor is all set to be inaugurated on October 2 with the work going on at full swing.

The Jammu and Kashmir government, Indian Railways and Indian Railway Construction Company Limited are working together on this project since August 2019, KNO reported.

Related posts

SDRF on the job, rescuing people from flooded areas

Residential, commercial areas flooded in Srinagar, Anantnag as Jhelum breaches flood alert in twin districts

August 28, 2025
Kashmir likely to have respite from scorching heatwave

Met predicts mainly dry weather in Kashmir, flood threat “extremely low”

August 28, 2025

“The PCEE inspection of the project will be conducted on 26 September, 2022 and on October 2, the project will be inaugurated,” Additional General Manager, Indian Railway Construction Company Limited Abid Amin Shah told KNO.

He said the total project cost is 324 crore and the Budgam-Baramulla section is already complete while the inspection of Budgam-Banihal section will be conducted on September 26 and it will be inaugurated on October 2.

“Railways Department has already conducted three to four trails from Budgam-Baramulla while trails of Budgam-Banihal will be conducted from 20th of this month,” Shah added.

According to him, the total route length for electrification is 137.73 kilometers with three main sub-stations of Qazigund, Budgam, and Baramulla from where power will be supplied to the overhead equipment of the rail line.

“The project is all set to reduce the pollution and also save 60 percent compared to the use of fuel,” he said.

Along with this, work is going on to link Banihal with Katra. When the Katra-Banihal link will be completed, Kashmir will be better linked with the rest of the country. It may be recalled that in 2013, Kashmir got its first train service when it was inaugurated by then Prime Minister Manmohan Singh.

Previous Post

Indian, Chinese armies carry out verification of disengagement process at PP-15

Next Post

J&K logs 47 new COVID-19 cases

Images News Netwok

Images News Netwok

Next Post
Record 9.18 lakh COVID tests done in a day, cumulative tests reach 3.26 cr

J&K logs 47 new COVID-19 cases

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.