• About us
  • Contact us
  • Our team
  • Terms of Service
Saturday, November 14, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Over 75% of 37 bridges, 97.6% tunnelling work on Katra-Banihal railway link completed: Officials

Press Trust of india by Press Trust of india
August 17, 2022
in TOP NEWS
A A
0
Lower ends of arch of world’s highest railway bridge in J&K connected
FacebookTwitterWhatsapp

Jammu: More than 75 percent of the total 37 bridges and 97.6 percent tunnelling work on the vital Katra-Banihal railway link stands completed, officials of the Northern Railways said, expressing hope that Kashmir will be connected to the rest of the country via train next year.
The Katra-Banihal stretch is part of the prestigious Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project which has missed several deadlines in the past amid huge cost escalations since 1997, when the then Prime Minister H D Deve Gowda laid its foundation at Udhampur.
In view of the importance of the USBRL project in providing seamless and hassle-free connectivity, the 272-Km-long railway line project was declared as a ‘national project’ in 2002.
While the 161 km was commissioned in phases with first phase 118-km Qazigund-Baramulla section commissioned in October 2009 followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014.
“The intervening stretch of the Katra-Banihal section (111 km) is in progress. This is, perhaps, the most difficult new railway line project undertaken in the Indian subcontinent. This section predominantly involves tunnelling of 164 Km (97.57 km main tunnel and 66.4 km of escape tunnel), in addition to construction of 37 bridges on Chenab river and its tributary Anji Khad,” an official said.
At present, he said 160.52 Km of tunnelling (95.47 km of main tunnel and 65.05 km of escape tunnel) and 28 bridges, out of total 37 have been completed, the official said.
He said the work on the project is going on in full swing and “we are hopeful about commissioning the final phase to connect Kashmir with the rest of the country next year.”
Referring to the completion of the overarch deck of Chenab railway bridge in Reasi district with the laying of the ‘golden joint’ on August 13 as a milestone, the official said the “minor” works on the nearly 1.3 km bridge is expected to be completed by November this year.
The paradigmatic bridge is located 359 m above the Chenab riverbed in Kauri village and is 30 m higher than the Eiffel Tower in Paris. Once completed, the bridge will be able to withstand winds with speed up to 260 kmph and will have a lifespan of 120 years, the official said.
The project has other firsts like the longest railway tunnel having overall length of 12.75 km situated between Sumber and Arpinchala in Sangaldan area of Ramban district which has been made through on February 15 and first cable-stayed bridge which when completed would be an engineering marvel of 21st century.
In addition, the official said a 205-km access road has also been completed which provides connectivity to far flung and inaccessible remote areas, leading to socio-economic development of the local residents.
The cumulative expenditure on Katra-Banihal section up to June is Rs 23,071 crore, he said. The officials said the electrification work on the railway line from Banihal to Baramulla is in progress and is likely to be completed by October.

More News

Slain SPOs laid to rest with honours in Kishtwar; LG Sinha pays tributes

CAASPI delegation proposes social defence volunteer groups in J&K

CM chairs Cabinet meeting in Jammu; key proposals discussed

Load More
Previous Post

North India may face irreversible decline in freshwater storage by 2060: Study

Next Post

CRPF men return lost rucksack to foreign tourist in Ramban

Press Trust of india

Press Trust of india

Related Posts

Slain SPOs laid to rest with honours in Kishtwar; LG Sinha pays tributes

Slain SPOs laid to rest with honours in Kishtwar; LG Sinha pays tributes
November 14, 2026

Kishtwar: Hundreds of people gathered in the remote Dachhan area of Kishtwar district on Friday to bid a tearful farewell...

Read moreDetails

CAASPI delegation proposes social defence volunteer groups in J&K

CAASPI delegation proposes social defence volunteer groups in J&K
November 14, 2026

Jammu: A delegation of the Centre for Activities for Advanced, Strong and Progressive India (CAASPI), Jammu and Kashmir, on Friday...

Read moreDetails

CM chairs Cabinet meeting in Jammu; key proposals discussed

CM chairs Cabinet meeting in Jammu; key proposals discussed
November 14, 2026

Jammu: Chief Minister Omar Abdullah on Friday chaired a meeting of the Council of Ministers here to deliberate on key...

Read moreDetails

Attack on CRPF post: Several suspects picked up for questioning

Searches intensified after Kathua attack; DGP reviews ongoing operation
November 14, 2026

Srinagar: Several suspects have been picked up for questioning in the aftermath of the Kulgam attack in which three CRPF...

Read moreDetails

BJP asks Pakistan to hand over PoK, says Kashmir integral part of India

Muslims will be looked after by the Modi govt: BJP leader Shahnawaz Hussain
November 14, 2026

New Delhi: The BJP on Friday asked Pakistan to hand over Pakistan-occupied Kashmir (PoK) to India, asserting that Kashmir was,...

Read moreDetails

NC ready for any sacrifice in struggle for restoration of J&K’s rights: Farooq Abdullah

Jammu can finally look forward to comprehensive development under NC rule: Farooq Abdullah
November 14, 2026

Srinagar: National Conference president Farooq Abdullah on Friday said his party is ready to make any sacrifice in the struggle...

Read moreDetails
Next Post
CRPF men return lost rucksack to foreign tourist in Ramban

CRPF men return lost rucksack to foreign tourist in Ramban

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.