• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, May 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

J&K on a mission to become largest clean energy-producing UT: Govt

Images News Netwok by Images News Netwok
July 27, 2022
in LOCAL
A A
0
State Administrative Council announces series of decisions
FacebookTwitterWhatsapp

SRINAGAR: J&K is on a mission to become one of the largest clean energy-producing UT in the country with an objective to reduce dependency on conventional sources of energy and enable J&K in attaining self-sufficiency in its energy needs.

J&K Government recognizes that renewable energy can also significantly increase J&K’s and the Nation’s energy security.

More News

Vishwagram Trust delegation calls on LG Sinha

NCW chairperson, KCCI delegation, others call on LG

Sakeena Itoo reviews ECCE interventions, calls for child-centric learning ecosystem in J&K

Load More

To achieve this milestone, the work is going on to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu to ensure that the electricity needs of the city are fully met from solar energy.

Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.

The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.

The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy is provided to the beneficiaries through the DBT mode.

An official said that these rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.

“With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units,” he added.

The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) targets of 10.5% as fixed by the Government of India.

The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant. 

The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE-approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

J&K has a good potential for solar energy and the renewable energy capacity would help to bridge a part of its power requirement. Under the new budget in PM KUSUM Scheme, 375 Solar Water Pumps will be installed in 2022-23 providing electricity benefit to 47159 souls, direct agriculture benefit to 18750 souls, and indirect agriculture benefit to 160000 souls. 

Notably, Prime Minister Narendra Modi inaugurated a 500-kilowatt solar power plant at Village Pali of Samba which will make it India’s first “carbon-neutral Panchayat”.

Previous Post

Tribal Affairs Department issues selection list under Top 50 coaching scheme

Next Post

J&K people ought to have a renewed political narrative to set attainable goals: Altaf Bukhari

Images News Netwok

Images News Netwok

Related Posts

Vishwagram Trust delegation calls on LG Sinha

Vishwagram Trust delegation calls on LG Sinha
May 19, 2026

Srinagar: A delegation of volunteers from Gujarat-based social organisation Vishwagram Trust led by its founder Sanjay Bhavsar called on Lieutenant...

Read moreDetails

NCW chairperson, KCCI delegation, others call on LG

NCW chairperson, KCCI delegation, others call on LG
May 19, 2026

Srinagar, May 18: Chairperson of the National Commission for Women, Vijaya K Rahatkar, on Monday called on Lieutenant Governor Manoj...

Read moreDetails

Sakeena Itoo reviews ECCE interventions, calls for child-centric learning ecosystem in J&K

Govt committed to developing emerging tourist destinations across J&K: Sakeena Itoo
May 19, 2026

 Srinagar: Minister for Education, Social Welfare and Health & Medical Education Sakeena Itoo on Monday chaired a high-level meeting to...

Read moreDetails

Deputy CM completes self-enumeration for Census 2027

Deputy CM completes self-enumeration for Census 2027
May 19, 2026

Srinagar: Deputy Chief Minister Surinder Choudhary on Monday completed the self-enumeration exercise for Census 2027 at the Civil Secretariat in...

Read moreDetails

Bihar, Jharkhand legislative committees call on Speaker J&K Assembly

May 19, 2026

Srinagar: Delegates of the Committee on Government Assurances of the Bihar Legislative Council, Minority Welfare Committee of the Bihar Legislative...

Read moreDetails

Bihar Assembly Minority Welfare Committee meets Sakina Itoo, Advisor to CM

May 19, 2026

Srinagar: A delegation of the Committee on Minority Welfare of the Bihar Legislative Assembly led by its chairman Akhtarul Iman...

Read moreDetails
Next Post
J&K people ought to have a renewed political narrative to set attainable goals: Altaf Bukhari

J&K people ought to have a renewed political narrative to set attainable goals: Altaf Bukhari

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.