• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, August 28, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

BDC chairman, 22 PRI members resign over admin’s failure to repair link road in Banihal

Press Trust of india by Press Trust of india
July 19, 2022
in TOP NEWS
A A
0
BJP ministers submit resignations to party president

resignations

FacebookTwitterWhatsapp

Jammu: A block development committee (BDC) chairman and other 22 members of the Panchayat Raj Institutions (PRI) resigned from their posts in protest against the alleged failure of the administration to repair a link road in Ramban district.

The Nachilana-Khari-Mundakbass link road, which caters to over 30,000 population of the hilly belt in Banihal sub-division, is in a very dilapidated condition as the road is being used by railway construction agency IRCON international for the past the two decades without carrying out any repair, they said.

Related posts

SDRF on the job, rescuing people from flooded areas

Residential, commercial areas flooded in Srinagar, Anantnag as Jhelum breaches flood alert in twin districts

August 28, 2025
Kashmir likely to have respite from scorching heatwave

Met predicts mainly dry weather in Kashmir, flood threat “extremely low”

August 28, 2025

In a joint letter to district magistrate Ramban, one BDC, six sarpanchs, five naib sarpanchs and 11 panchs said they have resigned from their posts over the failure of the administration and the IRCON to repair and maintain the hilly road link as well as indifferent attitude of authorities to address their demand.

“We are submitting joint resignation before your goodself, so that we come out of public pressure (due to failure of administration to repair and maintain road link by administration and IRCON). Please accept the resignation”, BDC chairman Khari, Sajjad Hussain said in the letter on Monday.

He said the link road is used by railway construction agency IRCON international and its tunnel construction partners for the past 15- 20 years but no repair work was carried out on the dilapidated road connecting over 30,000 population of Khari-Mahoo Mangit tehsil.

“Several  representations were given to district, tehsil, heads of PWD, IRCON, railway administration, besides protests were held in this regard but nothing was done so far,” Hussain said.

He said a cold response from the IRCON and the administration forced them to submit mass resignation.

“We 21 PRI representatives from Khari block submitted the same to DC Ramban for further action,” he added

Hussain said all PRIs are under pressure from the public over the poor condition of Nachilana-Khari-Mundakbass link road.

Previous Post

NIIFL acquires stake in J&K tunnel road Navayuga Quazigund Expressway for Rs 3,036 crore

Next Post

J&K admin notifies up to 125% enhancement in scholarship for tribal students

Press Trust of india

Press Trust of india

Next Post
Govt constitutes 3-member panel to probe KVIB recruitments

J&K admin notifies up to 125% enhancement in scholarship for tribal students

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.