• About us
  • Contact us
  • Our team
  • Terms of Service
Saturday, August 30, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

OPD services resume at B&J Hospital

Images News Netwok by Images News Netwok
March 8, 2022
in TOP NEWS
A A
0
GMC Jammu and its Associated Hospitals suspend OPD services
FacebookTwitterWhatsapp

Srinagar: The out patient department (OPD) of Bone and Joint Hospital at Barzulla resumed services today and nearly hundred patients were treated on the first day after devastating fire damaged it last week.

Medical Superintendent of the hospital, confirmed the resumption of OPD saying 105 patients were treated at the hospital today.

Related posts

Lieutenant Governor Greets People on Independence Day

LG sets up 3-member panel to inquire into recent landslide on Vaishno Devi route

August 30, 2025
BJP broke alliance with PDP over discrimination against Jammu: MoS PMO

Illegal mining, encroachments aggravating landslides: Jitendra Singh

August 30, 2025

The hospital was damaged after major fire broke out on Friday.

Presently the hospital is not in a position to admit the patients but all arrangements have been made to provide consultations to the patients, hospital sources said.

Sources said that a Trauma Unit has been set up at SMHS Hospital Srinagar and it caters to patients with poly-trauma.

They added that thirty persons injured in a grenade attack at Amirakadal on Sunday were treated at the Unit.

The sources further said that the admitted patients, who were evacuated in the wake of fire incident, are being treated at different hospitals.

“37 of them are being treated at SMHS Hospital while 18 patients were referred to SKIMS Medical College Bemina and the rest with minor problems were discharged,” the sources said.

Meanwhile, the hospital authorities said that the preliminary estimates suggest 90 percent equipment at the hospital was safe.

Medical Superintendent Dr Mian Suhail told KNO that main operation theatre, blood bank, digital CT, MRI, X-Ray plant, oxygen plant, boiler house, gensets, wards, laboratory, OPD, injection section, physiotherapy, plaster section, dressing section, drug and general store and records are safe.

He said that they are waiting for clearance from the engineering department for safety audit of the building to resume all the services in the hospital. Besides, they are waiting to get electric junctions repaired as water may have caused damage to them.

The government has set a 10 days deadline to resume all the services in the hospital.

Previous Post

LG stresses organic farming to bring paradigm shift in agrarian policy, rural prosperity

Next Post

Girl injured in grenade attack succumbs, toll reaches two

Images News Netwok

Images News Netwok

Next Post
Girl injured in grenade attack succumbs, toll reaches two

Girl injured in grenade attack succumbs, toll reaches two

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.