• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, May 18, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Govt approves Green Energy Corridor Phase-II with Rs 12,000-cr outlay

Press Trust of india by Press Trust of india
January 6, 2022
in BUSINESS
A A
0
Govt approves Green Energy Corridor Phase-II with Rs 12,000-cr outlay
FacebookTwitterWhatsapp

New Delhi:  The government on Thursday approved the second phase of the Green Energy Corridor with an outlay of Rs 12,031 crore to facilitate grid integration and power evacuation of about 20 GW of renewable energy projects in seven states.

“The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, today approved the scheme on Green Energy Corridor (GEC) Phase-II for Intra-State Transmission System (InSTS) for addition of approximately 10,750 circuit kilometres (ckm) of transmission lines and approx. 27,500 Mega Volt-Amperes (MVA) transformation capacity of substations,” an official statement said.

More News

PM Modi lands in Sweden; to hold talks on trade, technology, defence

Space intel giant ICEYE chooses India for first Asia-Pacific satellite manufacturing hub

Govt imposes import curbs on silver

Load More

The scheme will facilitate grid integration and power evacuation of about 20 GW of renewable energy (RE) projects in seven states — Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh.

Announcing the decision, Union Minister Anurag Thakur said the second phase will be implemented during 2021-22 to 2025-26 fiscal years.

The minister added that 80 per cent of the phase one work has been completed. The outlay of the first phase was Rs 10,142 crore.

The statement said the scheme (Phase-II) is targeted to be set up with total estimated cost of Rs 12,031.33 crore. The Central Financial Assistance (CFA) will be 33 per cent of the project cost, that is Rs 3,970.34 crore.

The CFA will help in offsetting the intra-state transmission charges and keep the power costs down. Thus, the government support will ultimately benefit the end users, it added.

The scheme will help in achieving the target of 450 GW installed RE capacity by 2030.

It will also contribute to long-term energy security of the country and promote ecologically sustainable growth by reducing the carbon footprint.

Besides, it will generate large direct and indirect employment opportunities for both skilled and unskilled personnel in power and other related sectors, the statement said.

This scheme is in addition to GEC Phase-I which is already under implementation in Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Tamil Nadu for grid integration and power evacuation of about 24 GW of RE.

It is expected to be completed this year.

The Phase-I is for addition of 9,700 ckm of transmission lines and 22,600 MVA capacity of substations having estimated cost of transmission projects of Rs 10,141.68 crore, with CFA of Rs 4,056.67 crore.

Previous Post

New Delhi World Book Fair 2022 postponed amid Covid restrictions

Next Post

Security breach: Modi meets President, minister says MHA will take ‘tough decisions’

Press Trust of india

Press Trust of india

Related Posts

PM Modi lands in Sweden; to hold talks on trade, technology, defence

Nation responds to PM’s call for fuel conservation
May 18, 2026

Gothenburg (Sweden): Prime Minister Narendra Modi landed in Sweden on Sunday, where he will hold talks on trade, technology, defence...

Read moreDetails

Space intel giant ICEYE chooses India for first Asia-Pacific satellite manufacturing hub

Space intel giant ICEYE chooses India for first Asia-Pacific satellite manufacturing hub
May 18, 2026

New Delhi:  ICEYE, a global leader in space-based intelligence, is set to establish its first Indian production facility within the...

Read moreDetails

Govt imposes import curbs on silver

Govt imposes import curbs on silver
May 17, 2026

New Delhi: Within days of levying high customs duties on precious metals, the government on Saturday imposed import curbs on...

Read moreDetails

NCB seizes first-ever consignment of Captagon drug worth Rs 182 crore

NCB seizes first-ever consignment of Captagon drug worth Rs 182 crore
May 17, 2026

New Delhi: The Narcotics Control Bureau has busted an international drug syndicate involved in the trafficking of Captagon and seized...

Read moreDetails

India, UAE sign energy, defence pacts during PM Modi’s visit

India, UAE sign energy, defence pacts during PM Modi’s visit
May 16, 2026

Abu Dhabi:  India and the UAE on Friday inked a series of landmark pacts spanning strategic petroleum reserves, long-term LPG...

Read moreDetails

BJP defends fuel hike, says ‘India kept price rise to 3% amid global surge’

Congress often takes position that benefits China instead of India: BJP
May 16, 2026

New Delhi:  The BJP on Friday defended the hike in fuel prices, claiming that India managed to shield citizens from...

Read moreDetails
Next Post
Security breach: Modi meets President, minister says MHA will take ‘tough decisions’

Security breach: Modi meets President, minister says MHA will take 'tough decisions'

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.