• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, March 16, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home EDITORIAL

Railway connectivity should be the priority

Editor by Editor
October 13, 2021
in EDITORIAL
A A
0
Medical Mafia
FacebookTwitterWhatsapp

Union Minister of State for Railways, Coal and Mines, Raosaheb Patil Danve, while reviewing the progress on 272 kms long Udhampur-Srinagar-Baramulla Railway Line (USBRL) project has directed the concerned agencies to complete the project by 2023 asserting that there is no dearth of funds for the development and welfare of the people of the country.  He directed the administration and construction agencies to redouble their efforts to meet its timely completion and instructed the concerned authorities to adopt the permission procedure in due course of time for procurement of construction material so that early completion of this prestigious project is ensured. He has also enquired about causes of delay of project, and sought a detailed report on project’s cost escalation from Chief Engineers of all wings of the project. The officials said that the total length of USBRL is 272 KMs, of which 161 KM has already been commissioned, while as the work on the rest 111 Kms Katra-Banihal stretch is in progress and is expected to be completed by April 2023. The Katra- Banihal stretch comprises 27 numbers of main tunnels and 8 numbers of escape tunnels involves 97 Kms tunnelling work. The T-49 is the longest tunnel, 12.75 Kms situated between Sumber- Arpinchala in Sangaldan area of Ramban district.

Undoubtedly this railway project is a dream project particularly for the people of Kashmir Valley as they have very fragile road connectivity with Jammu and rest of the country. The Jammu-Srinagar National Highway is a fair-weather road and its frequent closures due to weather conditions have been impacting the overall economy of the Valley besides disturbing day-to-day affairs. As Kashmir is a consumer society therefore everything from fuel to eatables come from other parts of the country and the frequent closures of the highway impact the supply chain. Equally, the closures impact ferrying of fruits from Kashmir to rest of the country thus impacting Kashmir’s  economy.  In this backdrop, the USBRL is something that will revolutionize the economy here and help people to gell with the national mainstream.

More News

Integrated Aqua Park Vision

Government Pushes Hiring Drive

Human Cost of Judicial Inertia

Load More

That said, the project has missed several deadlines and that is what makes people skeptical about the official claims. The work on the Rs 21,653 crore Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, which is the most challenging railway infrastructure project being undertaken post-independence, was started in 1997 and has missed several deadlines amid huge cost escalations. Out of the total 272 km USBRL project, the 161 km was commissioned in phases with the first phase of the 118-km Qazigund-Baramulla section commissioned in October 2009, followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014. The under-construction 111-km Katra-Banihal section has 37 bridges (26 major and 11 minor), 35 tunnels with a length of 164 km (main 27 with 97.64 km and eight escape tunnels with 66.40 km). This project is the longest railway tunnel having an overall length of 12.75 km, the highest railway bridge in the world which is higher than the iconic Eiffel tower of Paris. It is the first cable-stayed bridge which when completed, according to railway officials, would be an engineering marvel of the 21st century.

With the administration asserting that the project will be completed very soon, it is hoped that no more deadlines are missed and the work is finished within the time frame thus avoiding further cost escalations. The surface communication is vital for the progress of any place, Kashmir being no exception. As already mentioned, the existing Jammu-Srinagar Highway is too fragile to keep the promise of modern surface communication. During winters, it remains closed for days together thus hampering the supplies to the Valley resulting into black marketeering and inflation here The railway link would be a great boost to Kashmir’s economy and will improve the quality of life here The concerned authorities need to take the project on priority basis and complete it within given time frame.

Previous Post

Religious and racial hatred propelled by A.I.

Next Post

CBK chargesheets man for misappropriating govt money

Editor

Editor

Related Posts

Integrated Aqua Park Vision

Theme Park, a great initiative
March 16, 2026

Kashmir’s waters have long been its quiet strength, sustaining life and tradition. The announcement of a large-scale aqua project in...

Read moreDetails

Government Pushes Hiring Drive

Theme Park, a great initiative
March 14, 2026

The issue of recruitment in Jammu and Kashmir has long been a matter of concern, both for governance and for...

Read moreDetails

Human Cost of Judicial Inertia

Theme Park, a great initiative
March 13, 2026

Supreme Court’s recent observations on the state of criminal trials in Jammu and Kashmir have once again brought into sharp...

Read moreDetails

Energy Shock Hits Kashmir

Theme Park, a great initiative
March 12, 2026

India’s decision to divert domestically produced natural gas to priority sectors such as LPG, CNG, and piped gas may be...

Read moreDetails

Skilling Youth for Tomorrow

Theme Park, a great initiative
March 11, 2026

The challenge of unemployment has long weighed heavily on the educated youth of Jammu and Kashmir, where aspirations often collide...

Read moreDetails

Jhelum’s Climate Warning

Theme Park, a great initiative
March 10, 2026

Jhelum dipping below the zero-gauge mark in early March is more than a hydrological anomaly; it is a stark warning...

Read moreDetails
Next Post
Crime Branch registers case against Sachdeva Metal Works

CBK chargesheets man for misappropriating govt money

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.