• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, August 29, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

BRO to facilitate troop movement in Ladakh

Press Trust of india by Press Trust of india
January 13, 2021
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Leh: The Border Roads Organisation has launched a special snow-clearing operation to keep strategic roads and passes open for troop movement amid the tension along the Line of Actual Control (LAC), officials said, as the force’s personnel brave freezing temperatures and intimidating altitudes to keep communication lines opened.

BRO officials said the organisation has launched project ‘Himank’ to undertake the arduous and daunting task of keeping the strategically important roads along the LAC open even though that meant maneuvering some of the highest mountain passes in the world and working in temperatures going down to minus 35 degrees Celsius.

Related posts

Water starts receding in Jhelum, flood threat eases, BUT…

Water starts receding in Jhelum, flood threat eases, BUT…

August 29, 2025
   Two killings/deaths in J&K, people want answers

4 more bodies found as post-flood rescue work continues in Jammu

August 29, 2025

“Winter snow clearance task this year has been particularly more challenging considering the altitude, extreme weather and the heavy deployment of the troops along the LAC,” a senior BRO official said.

Officials said that BRO personnel deployed at altitudes ranging from 16,500-18,000 feet are relentlessly executing the winter snow-clearance.

They said the strategically important road axes and prominent mountain passes where the snow-clearance operations are carried out include Chang la, Warila, Marshimikla , Kajukondla, Kassangla, Umlingla, besides the Durbuk-Shyok-Daulat Beig Oldie Road.

During the winters, the only existing road axis connecting DBO in Sub Sector North, Hot Spring  and Chushul in  Eastern Ladakh, and gateway to Changthang Sector of Ladakh (via Changhla and Warila passes) gets blocked due to heavy accumulation of snow.

Officials said that to provide sustenance to troops deployed in these areas amid the tension with China, road construction companies are working tirelessly to keep the roads open and ensure connectivity all through the winter.

“To keep the roads open, meticulous  planning  and resources mobilisation were undertaken and adequate advance winter stocking including that of equipment spares and winter diesel was done,” one of them said.

Previous Post

J&K witnessed positive changes in past two years: DGP

Next Post

65% physical work on Z-MORH tunnel completed: Div Com

Press Trust of india

Press Trust of india

Next Post
65% physical work on Z-MORH tunnel completed: Div Com

65% physical work on Z-MORH tunnel completed: Div Com

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.