• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, March 22, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

CCEA approves Rs 1,810-cr investment for 210 MW hydropower project in Himachal

Press Trust of india by Press Trust of india
November 5, 2020
in BUSINESS
A A
0
CCEA approves Rs 1,810-cr investment for 210 MW hydropower project in Himachal
FacebookTwitterWhatsapp

New Delhi:  The Union Cabinet on Wednesday approved a proposal to invest Rs 1,810 crore for 210 MW Luhri Stage-I hydropower project on river Satluj in Himachal Pradesh.

“The Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi has approved the investment of Rs 1,810.56 crore for 210 MW Luhri Stage-I Hydro Electric Project located on river Satluj which is situated in Shimla and Kullu districts of Himachal Pradesh,” an official statement said.

More News

Premium petrol price up Rs 2, industrial diesel up Rs 22; no change in normal petrol, diesel rates

Middle East war: IEA suggests carpooling, less air travel, speed curbs to ease oil shock

Amid supply disruptions, govt emphasis on improving logistics ecosystem

Load More

This project will generate 758.20 million units of electricity annually, it added.

The project is being implemented by Satluj Jal Vidyut Nigam Ltd (SJVNL) on Build-Own-Operate-Maintain (BOOM) basis with active support from the Government of India and the state government.

The memorandum of understanding (MoU) of this project was signed with the Government of Himachal Pradesh during ‘Rising Himachal, Global Investor Meet’, held in November 2019.

The Government of India is also supporting this project by providing grants of Rs 66.19 crore for enabling infrastructure which has helped in reducing in power tariff.

The Luhri Stage-I Hydro Electric Project shall be commissioned within a span of 62 months, the statement said.

The power generated from the Project will help in providing grid stability and will improve the power supply position.

Besides adding valuable renewable energy to the grid, the project would also lead to reduction of 6.1 lakh tonnes of carbon dioxide from environment annually, thus contributing to improvement in air quality, it said.

The construction activities of the project will result in direct and indirect employment to around 2,000 persons and will contribute to overall socioeconomic development of the state, the statement said.

Further, Himachal Pradesh will benefit with free power worth around Rs 1,140 crore from Luhri Stage-I Hydro Electric Project, during project life cycle of 40 years.

The project affected families will be provided with 100 units of free electricity per month for ten years, it said.

The SJVNL has forayed into the fields of renewable energy, power transmission and thermal power generation. It has envisaged internal growth targets of total installed capacity from all sources of 5,000 MW by 2023, 12,000 MW by 2030 and 25,000 MW by year 2040.

Previous Post

The Mediterranean Cauldron

Next Post

UK raises terror threat level to ‘severe’ after attacks in Austria, France

Press Trust of india

Press Trust of india

Related Posts

Premium petrol price up Rs 2, industrial diesel up Rs 22; no change in normal petrol, diesel rates

Let’s not slip again
March 20, 2026

New Delhi: The price of premium or higher-grade petrol price on Friday was increased by Rs 2 per litre while...

Read moreDetails

Middle East war: IEA suggests carpooling, less air travel, speed curbs to ease oil shock

Iran Crisis: No immediate oil disruption for India; Russia pivot possible if conflict drags on
March 20, 2026

New Delhi: Reducing highway speed limits by at least 10 km/h, switching to electric cooking, avoiding air travel where alternatives...

Read moreDetails

Amid supply disruptions, govt emphasis on improving logistics ecosystem

March 20, 2026

New Delhi:  With the West Asia conflict disrupting the global supply chain, the government has given maximum emphasis on improving...

Read moreDetails

PM invites global investors to invest in power sector

Ease of justice must for all, language of law should be local, simple: PM Modi
March 19, 2026

New Delhi:  Prime Minister Narendra Modi on Thursday invited global investors to invest in the power sector, urging them to...

Read moreDetails

Rajnath cites global conflicts, says India must become self-reliant in drone manufacturing

“Democratic process to begin soon in J&K; AFSPA to be removed when lasting peace prevails”
March 19, 2026

New Delhi: India must develop a robust ecosystem for drone manufacturing to enhance its defence preparedness, Defence Minister Rajnath Singh...

Read moreDetails

Govt classifies energy data as national security matter; mandates disclosure across oil, gas chain

March 19, 2026

New Delhi:  The government has classified energy data as a matter of national security, mandating all entities across the oil...

Read moreDetails
Next Post
UK raises terror threat level to ‘severe’ after attacks in Austria, France

UK raises terror threat level to 'severe' after attacks in Austria, France

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.