• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, May 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

‘Z-Morh tunnel to be completed by Jun 2021, Zoji-La tunnel by June, 2026’

Images News Netwok by Images News Netwok
July 21, 2020
in TOP NEWS
A A
0
‘Z-Morh tunnel to be completed by Jun 2021, Zoji-La tunnel by June, 2026’
FacebookTwitterWhatsapp

Srinagar: Work on the 6.5-km Z-Morh tunnel, part of a strategic project for ensuring round-the-year connectivity between Kashmir Valley and Ladakh region, is being undertaken on a war-footing and it will be completed by June 2021, an official spokesman said here Monday.

The spokesman said the information about the status of works on the Z-Morh tunnel was given at a meeting chaired by Chief Secretary, B V R Subrahmanyam.

More News

SC flags low conviction in UAPA cases, says 90% trials culminate in acquittals

LG Sinha reviews construction work at Pantha chowk Yatri Niwas

Jailed MP Engineer Rashid’s father dies at 85

Load More

The Chief Secretary took the meeting of National Highway Infrastructure Development Corporation Limited (NHIDCL) to review the progress of various road projects being undertaken by them in Jammu & Kashmir.

With regard to Kashmir province, the meeting was informed that works on mega projects including Z-Morh tunnel and Zoji-La tunnel, are being undertaken on a war-footing, the spokesman said.

“During the meeting, it was given out that Z-Morh tunnel project comprises 6.5-km tunnel, a 6-km approach road, two major bridges and one minor bridge. The project worth Rs. 2,379 crores is expected to be completed by 30th June, 2021 and will provide round-the-year connectivity to Sonamarg,” he said.

Work under Zoji-La project are also being taken up simultaneously.

It was mentioned that this project comprehensively includes a 14.15-km tunnel, an 18-km approach road between Z-Morh and Zoji-La tunnel as a single integrated package, besides carriageway, two snow galleries, four major bridges and 18 avalanche-protection dams, he added.

The project will cost Rs. 4,430 crores and is expected to be operational by June, 2026, which will enable round-the-year connectivity to Ladakh, the spokesman added.

The Chief Secretary also reviewed progress of Baramulla- Gulmarg, Vailoo-Khanabal, Vailoo-Donipawa, Donipawa-Ashajipora road projects.

While reviewing the progress on road projects being executed in Jammu province, it was informed that a penalty of Rs 25 lakh has been imposed on the erring contractor for abandoning project works under third package of Jammu-Akhnoor road, and the works will resume shortly.

Meanwhile, Deputy Commissioner Jammu, maintained that 15 km stretch is currently encumbrance free and the rest will be made available by 30th July, 2020, so as to enable speedy completion of the project.

Moreover, Chief Secretary urged Divisional Commissioner, Jammu to allow contractors to bring in migrant labourers and equipment after observing the duly established protocols and standard operating procedures with respect to COVID -19 mitigation efforts.

The Chief Secretary emphasised on effective monitoring of projects to ensure their timely completion.

Previous Post

Territorial jurisdictions of 8 ACB police stations notified

Next Post

Flouting COVID-19 norms to attract hefty fines: Admin

Images News Netwok

Images News Netwok

Related Posts

SC flags low conviction in UAPA cases, says 90% trials culminate in acquittals

SC says will consider listing of pleas challenging abrogation of Article 370
May 19, 2026

New Delhi: The Supreme Court on Monday flagged low conviction rates under the Unlawful Activities (Prevention) Act and said that...

Read moreDetails

LG Sinha reviews construction work at Pantha chowk Yatri Niwas

LG Sinha reviews construction work at Pantha chowk Yatri Niwas
May 19, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Monday reviewed the ongoing construction works and pilgrim facilities at Shri Amarnath Shrine Board...

Read moreDetails

Jailed MP Engineer Rashid’s father dies at 85

Out on interim bail, Engineer Rashid meets ailing father in Srinagar hospital
May 19, 2026

Srinagar: The father of jailed Baramulla MP Sheikh Abdul Rashid, also known as Engineer Rashid, died at a hospital in...

Read moreDetails

CM expresses grief over demise of father of MP, MLA Khursheed Ahmad

CM assures priority redressal of public concerns
May 19, 2026

Srinagar: Chief Minister Omar Abdullah has expressed deep grief and sorrow over the passing away of Khazir Mohammad Sheikh, father...

Read moreDetails

Person cannot be declared “history-sheeter”, placed under surveillance ‘mechanically’ HC

PM Modi inaugurating incomplete projects for votes: JKPCC
May 19, 2026

Srinagar: The High Court of Jammu & Kashmir and Ladakh has ruled that a person cannot be declared a “history-sheeter”...

Read moreDetails

Have urged chief justices of all HCs to conduct virtual hearings: CJI

‘Imaandari’ not mere ornament to character, it sustains justice and reputation: CJI
May 19, 2026

New Delhi: Chief Justice of India Surya Kant said on Monday that he had requested the chief justices of all...

Read moreDetails
Next Post
Coronavirus cases in country increases to 137, one more death on Tuesday

Flouting COVID-19 norms to attract hefty fines: Admin

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.