• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, January 20, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt

Press Trust of india by Press Trust of india
April 27, 2020
in BUSINESS
A A
0
Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt
FacebookTwitterWhatsapp

New Delhi: The government on Sunday said the production capacity of PPE coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, with Bengaluru emerging as a major hub for its production.

“The PPE kits are being sent to states by the Ministry of Health as per requirement.

More News

IMF raises India’s GDP growth projection to 7.3% for FY26

India set to transition to upper-middle income country by 2030, says SBI report

SC flags concern over exorbitant rise in airfares during festivals

Load More

“Ministry of Health & Family Welfare, Department of Pharmaceuticals, and Ministry of Textiles are continuously working with various industry bodies, stakeholders and manufacturers on 24×7 basis, to streamline the supply chain, remove bottlenecks and maintain a steady supply of all materials required for the healthcare professionals,” an official statement said.

Production capacity of coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, it added.

Nearly fifty per cent of the coverall production in the country is from Bengaluru.

Other than Bengaluru, PPE coveralls are also being manufactured by approved production units in Tirupur, Chennai and Coimbatore in Tamil Nadu, Ahmedabad and Vadodara in Gujarat, Phagwara and Ludhiana in Punjab, Kusumnagar and Bhiwandi in Maharashtra, Dungarpur in Rajasthan, Kolkata, Delhi, Noida, Gurugram and few other places.

“The cumulative production till date is approximately one million coverall units,” the statement issued by the Textile Ministry said.

Body coveralls (PPE) have a stringent technical requirements as prescribed by the Ministry of Health & Family Welfare since it is a specialized protective suit meant for high level of protection to health professionals.

HLL Lifecare Limited is the designated single-window procurement agency for the hospitals and healthcare organisations under the Ministry of Health & Family Welfare.

In the last week of January 2020, the technical standard for the coveralls was prescribed as per WHO class-3 exposure pressure in accordance with ISO 16003 or its equivalent.

“Such materials were being manufactured by a few international companies, who expressed their inability to supply on account of a complete glut in stocks and ban of exports by the source countries. Only a limited quantity was offered and procured by the procurement organization of the Ministry of Health & Family Welfare,” the statement said.

The health ministry finalised the technical requirement on March 2, based on the indigenous availability of materials and the technical requirement for a high level of protection of the healthcare professionals who would deal with the COVID-19 cases, in consultation with medical experts in the field.

The specification was published on the official website of HLL Lifecare Ltd on 5 March 2020, inviting manufacturers having adequate capability to participate in the procurement process.

As of now, there are four laboratories in the country which have the Synthetic Blood Penetration Resistance Test facilities as well as necessary approvals for conducting tests and certification for Body Coveralls (PPE) required for COVID-19.

These are – South India Textiles Research Association (SITRA), Coimbatore, Defence Research and Development Establishment (DRDE), Gwalior, and two laboratories under Ordnance Factory Board – Heavy Vehicles Factory, Avadi and Small Arms Factory, Kanpur.

Previous Post

COVID-19 cases in Wuhan hospitals drop to zero for 1st time: official

Next Post

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Press Trust of india

Press Trust of india

Related Posts

IMF raises India’s GDP growth projection to 7.3% for FY26

IMF warns US fiscal, trade policies create risks to global economy
January 19, 2026

New Delhi: The IMF on Monday raised India's growth projection to 7.3 per cent for fiscal 2025-26, up 0.7 percentage...

Read moreDetails

India set to transition to upper-middle income country by 2030, says SBI report

SBI posts record net loss of Rs 7,718 cr in Q4 on higher NPAs
January 19, 2026

New Delhi: India is set to transition to 'upper-middle income' country in next four years in 2030, joining the ranks...

Read moreDetails

SC flags concern over exorbitant rise in airfares during festivals

January 19, 2026

New Delhi:  The Supreme Court on Monday said it would interfere with the "unpredictable fluctuations" in airfares and flagged the...

Read moreDetails

PM unveils development projects worth over Rs 830 cr in Bengal

Pahalgam terror attack: PM Modi steps up diplomatic offensive against Pak
January 18, 2026

Singur (WB): Prime Minister Narendra Modi on Sunday launched development projects worth over Rs 830 crore in West Bengal and...

Read moreDetails

SC places before CJI plea for SOP on freezing, de-freezing of bank accounts during cybercrime probes

SC says will consider listing of pleas challenging abrogation of Article 370
January 18, 2026

New Delhi:  The Supreme Court has directed that a plea seeking directions to the Centre and the Reserve Bank of...

Read moreDetails

Partner with Bharat, subscribe to future: India at WEF

January 18, 2026

Davos:  From a new address here, once occupied by the iconic Piano Bar, Team India has a clear message written...

Read moreDetails
Next Post
Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.