• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, April 3, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Vital inter-district road restored after remaining closed for nearly a month

KI News by KI News
September 23, 2025
in CITY & TOWNS, LOCAL
A A
0
Traffic restored on Jammu-Srinagar highway

File Photo

FacebookTwitterWhatsapp

Jammu: A vital road connecting Rajouri, Reasi and Ramban districts was restored by the Border Roads Organisation (BRO) after nearly month-long closure owing to major damage in the aftermath of heavy rainfall, a defence spokesperson said on Tuesday.

The restoration of the Budhal-Mahore-Gul (BMG) road, a strategically important surface link for the movement of troops and supply of logistics across important areas of Pir Panjal range, has come as a major relief for the local populace, he said.

More News

Over 16,000 kanals of JDA land under encroachment: CM Omar Abdullah

233 illegal structures identified in Jammu since Jan 2025; 61 demolished: Govt

PHE, Irrigation, CRPF among top defaulters on power tariffs

Load More

It is the primary route that connects remote villages to sub-divisions and district headquarters, making it essential for the transport of goods, services, and emergency response, the spokesperson said.

On August 28, due to excessive rainfall in the Pir Panjal region and flash floods, Badora diversion on this road in Reasi district was severely impacted and washed out completely.

“This event had widespread consequences, affecting 15 villages and hindering inter-district and intra-district connectivity, specifically between Reasi, Rajouri, and Ramban districts. The diversion, which was a vital transport link in this rugged and remote region, was blocked, disrupting the flow of goods, services, and people across these areas,” the spokesperson said.

In addition to the immediate damage caused by the floodwaters, he said the situation was worsened by multiple landslides that occurred along the BMG road.

“These landslides prevented the machinery and resources necessary for the restoration of the diversion from reaching the site. Given the terrain and the extreme weather conditions, initial progress in assessing and repairing the damage was halted, leading to delays in the restoration works,” he said.

Despite these significant obstacles, the spokesperson said a team of 110 RCC under 31 Border Roads Task Force (BRTF) Project Sampark took the challenge head-on.

Clearing of the landslide debris was started but it was not until September 8 that the necessary resources finally reached the Badora site. By that time, however, the water flow from the Badora Nallah, a rivulet that flows near the diversion, had increased significantly, further complicating efforts to restore the infrastructure, he said.

Faced with these challenges, the team decided to approach the situation using a combination of innovative engineering techniques and strategic planning, the spokesperson said.

He said the first major step was the diversion of water flow to allow for safe access to the affected area.

This was achieved by constructing a temporary water channel using River Bed Material (RBM), which diverted the flow of the rivulet and reduced the pressure on the damaged infrastructure, he said.

With the water flow under control, the spokesperson said work on restoring the diversion began on September 12.

After 10 days of continuous hard work, the Badora diversion was successfully restored by September 20, he said.

In addition to the Badora diversion, he said another major challenge arose due to the sinking of road formation along a 300-metre stretch and a vertical drop of 12 metres at Sarh and Jamslan.

“This damage, also caused by heavy rains, had further affected connectivity in the region. However, connectivity at these locations was also successfully restored by 110 RCC, reaffirming their capability and resilience in the face of natural calamities,” he added.

Previous Post

Dy CM conducts extensive tour of Srinagar, Ganderbal districts

Next Post

The Unseen Scars: When Exploitation Erodes Trust

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

Over 16,000 kanals of JDA land under encroachment: CM Omar Abdullah

Assembly proceedings: CM Omar Abdullah reaffirms daily-wager regularisation
April 3, 2026

Jammu: Chief Minister Omar Abdullah said on Thursday that over 16,000 kanals of land under the Jammu Development Authority (JDA)...

Read moreDetails

233 illegal structures identified in Jammu since Jan 2025; 61 demolished: Govt

AC extends Amnesty Scheme-2022 for domestic consumers of electricity till March 2025
April 3, 2026

Jammu: The Jammu and Kashmir government on Thursday said that a total of 233 illegal commercial and residential structures have...

Read moreDetails

PHE, Irrigation, CRPF among top defaulters on power tariffs

‘J&K leading the charge in electricity sector reforms’
April 3, 2026

Jammu: Chief Minister Omar Abdullah on Thursday said that outstanding electricity dues across government departments, public sector units and security...

Read moreDetails

527 stone crushers operational in J&K: Deputy Chief Minister

Govt to take steps for ethical news dissemination: Dy CM
April 3, 2026

JAMMU: Deputy Chief Minister Surinder Choudhary today informed that 527 stone crusher units are operational in Jammu and Kashmir following...

Read moreDetails

No shortage of LPG, fuel in J&K: Satish Sharma

April 3, 2026

Jammu, April 2: Minister for Food, Civil Supplies and Consumer Affairs Satish Sharma on Thursday informed the Legislative Assembly that...

Read moreDetails

HUDD embraces digital processes for seamless building permissions: Sakeena Itoo

April 3, 2026

JAMMU: The government today informed that significant governance reforms with automated scrutiny and end-to-end digital processing has been embraced by...

Read moreDetails
Next Post
Regional-bilateral significance of Nepal PM Dahal’s India visit

The Unseen Scars: When Exploitation Erodes Trust

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.