• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, August 19, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Power shutdown schedule announced for multiple areas

KI News by KI News
March 24, 2025
in CITY & TOWNS, LOCAL
A A
0
FacebookTwitterWhatsapp

SRINAGAR: The Kashmir Power Distribution Corporation Limited (KPDCL) and Jammu & Kashmir Power Transmission Corporation Limited (JKPTCL) have announced scheduled power shutdowns in various areas to facilitate infrastructure upgrades and maintenance work.

As per the Chief Engineer, Distribution, KPDCL, power supply will be affected in the following areas:

Related posts

Deputy CM visits landslide, cloudburst-hit villages in Kathua

Deputy CM visits landslide, cloudburst-hit villages in Kathua

August 18, 2025
Rana reviews relief, rehabilitation measures in Mendhar

Rana reviews relief, rehabilitation measures in Mendhar

August 18, 2025

33KV Nagam-Hafroo Tap Line: Shutdown on March 26, 2025, from 09:30 AM to 05:30 PM, impacting Barwah, Hafroo, Lolipora, Watkul, Darwan, Shopora, Buzgoo, Brinjin, and adjoining areas due to the laying of a conductor on 11-meter-long poles.

33KV Halmulla-Khiram Line: Shutdown on March 26 and 29, 2025, from 09:00 AM to 02:30 PM, affecting Mehand, Sirhama, Khiram, Shalgul, Nowshera, and nearby areas for augmentation and stabilization of the conductor.

33KV Wanpoh SICOP Line: Shutdown on March 26 and 29, 2025, from 09:00 AM to 02:30 PM, impacting Veer, Srigufwara, Zirpara, Shamsipora, and Bijbehara SICOP due to conductor augmentation.

Additionally, as per the Chief Engineer, JKPTCL, a shutdown of the 132 KV Delina-Pattan Transmission Line Ckt-I will be observed on March 25, 2025, from 10:00 AM to 03:00 PM for 132 KV CT erection work at Grid Substation Delina. This will affect power supply to Kunzer, Kongamdar, Ahmadnagar, Dhobiwan, Lolpora, Khoore, Agar, Beerwah, Magam, and surrounding areas.

 

 

 

 

 

 

 

Previous Post

Iyer aims to build on captaincy credentials as Punjab Kings open against Gujarat Titans

Next Post

DC Srinagar finalizes arrangements for Shab-e-Qadr, Jumat ul vida, Eid-ul-Fitr

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Next Post

DC Srinagar finalizes arrangements for Shab-e-Qadr, Jumat ul vida, Eid-ul-Fitr

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.