• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, February 12, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Contractors served notices for repairing of roads in Udhampur West: Javed Dar

KI News by KI News
March 18, 2025
in CITY & TOWNS, LOCAL
A A
0
FacebookTwitterWhatsapp

JAMMU: Minister for Rural Development Department, Javed Ahmad Dar, today informed the House that the roads being constructed by PMGSY in Udhampur West constituency are under a Defect Liability Period (DLP) for a period of 5 years. If any damage is found after construction or during the maintenance period then it is being rectified by the Contractor, he added.

The Minister was replying on behalf of the Deputy Chief Minister to a question raised by Pawan Kumar Gupta in the Legislative Assembly.

More News

Search operation underway in Doda

Tourist hut at Naranag shall be completed after Forest Deptt verification: CM Abdullah

CM Abdullah assures to digitise only accurate land records in J-K

Load More

He said that the roads being executed in Udhampur West Assembly Constituency under NABARD are in good condition and no substandard material has been used in PMGSY/NABARD roads

However, the Minister informed that the blacktopping done on 7 km road from Kainthgali Block Boundary Udhampur to Bariote Upto Moungri, currently under construction, was removed and Wet Mix Macadam was re-laid when the authorities noticed defect in this entire 7 km road. He said that, as the weather improves, 50 mm thick Bituminous Macadam and 20 mm OGPC will be re-laid and whole rectification would be done by the concerned contractor.

The Minister informed the House that various contractors have been served notices for repairing defects and damages of roads during DLP. He said that the roads to be repaired under the Defect Liability Period (DLP) included road projects from Garhi to Gathiyal Morh, LO23- NH1A Km 63rd to Gandala, Gandala to Narore, Kainthgali Bariote Km 20th to Jesserkote, Moungri to Ladda, Kainthgali Bariote km 44 to Lali and Mir to Saroffti. The notices have been issued to the Contractor for restoration of the damages and defects in these roads to facilitate seamless connectivity to the people.

The Minister said that the NRIDA arranges third party technical assessment and external Quality Assurance by deploying National Quality Monitors, whose responsibility is to verify that the UT’s Quality Management is adequate in implementing the road infrastructure works.

Keeping the road safety measures in view, crash barriers have been installed at various vulnerable spots on a number of roads, added the Minister.

Previous Post

JKBOSE notifies fresh dates for postponed examinations in Hard Zone Gurez

Next Post

WSSs worth Rs 391.57 cr undertaken under JJM in Samba: Javed Rana

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

Search operation underway in Doda

Search operation continues in Rajouri
February 12, 2026

Jammu: Security forces on Wednesday launched a search operation following information about suspicious movement of three persons in a remote...

Read moreDetails

Tourist hut at Naranag shall be completed after Forest Deptt verification: CM Abdullah

Tourist hut at Naranag shall be completed after Forest Deptt verification: CM Abdullah
February 11, 2026

JAMMU: Chief Minister Omar Abdullah, who is also the Minister-in-Charge of the Tourism Department, today informed the Jammu and Kashmir...

Read moreDetails

CM Abdullah assures to digitise only accurate land records in J-K

CM optimistic that Business Rules will be corrected soon
February 11, 2026

Jammu: Jammu and Kashmir Chief Minister Omar Abdullah on Wednesday said his government is committed to ensuring complete accuracy in...

Read moreDetails

High-Level Committee to finalise modalities for stone quarrying: Dy CM

Baba Reshi–Gulmarg Road DPR prepared; govt reiterates commitment to robust road connectivity: Deputy CM
February 11, 2026

JAMMU: Deputy Chief Minister, Surinder Choudhary, today said that a High Level Multi-Departmental Committee has been constituted to examine and...

Read moreDetails

Zainpora Constituency gets new Lift Irrigation Scheme: Javed Rana

Rs 1632 Cr. Master Plan in pipeline for river Jhelum flood mitigation: Rana
February 11, 2026

JAMMU: Minister for Jal Shakti, Javed Ahmed Rana, today informed the Legislative Assembly that the government has sanctioned a new...

Read moreDetails

Govt prioritises sustainable livelihoods via entrepreneurship, skilling, reforms: Deputy CM

February 11, 2026

JAMMU: Deputy Chief Minister, Surinder Choudhary, today said that addressing unemployment remains a top priority of the Jammu and Kashmir...

Read moreDetails
Next Post

WSSs worth Rs 391.57 cr undertaken under JJM in Samba: Javed Rana

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.