• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, August 27, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home Latest News

Trial run completed as Vande Bharat Express reaches Sgr station

KI News by KI News
January 25, 2025
in Latest News
A A
0
Kashmir-bound Vande Bharat Express arrives at Jammu Tawi station
FacebookTwitterWhatsapp

Srinagar: The trial run of the first Vande Bharat Express train from Shri Mata Vaishno Devi Railway Station, Katra, to Budgam has been successfully completed, railway officials said.

Officials told the news agency—Kashmir News Observer (KNO) that one-way trial run of the Vande Bharat Express train was completed today. “The train arrived in the Jammu Division on Friday and reached Srinagar today.”

Related posts

Locomotive of Jammu-bound train detaches from coaches in Punjab

58 trains cancelled in Jammu division, rail traffic suspended due to flash floods

August 27, 2025
Over 5000 people evacuated from flooded parts of Jammu, efforts on to restore essential services

Over 5000 people evacuated from flooded parts of Jammu, efforts on to restore essential services

August 27, 2025

Vande Bharat Express ICF rakes 49 and 80 have been nominated for commercial operation in the USBRL section. “These Vande Bharat Express trains are uniquely designed for cold conditions during the winter season with feature advanced technologies to ensure comfort, safety, and reliability,” officials said.

The train also passed through the iconic Anji Khad Bridge, India’s first cable-stayed rail bridge, and the Chenab Bridge, which is the world’s highest railway bridge.

Specially designed to withstand the cold climate of the Kashmir Valley, this is the third Vande Bharat train introduced for Jammu & Kashmir, but the first to serve the Kashmir Valley. The Northern Railway zone will oversee its operations and maintenance.

The train includes advanced heating systems to prevent the freezing of water and bio-toilet tanks. It also features a unique air-brake system and warm air circulation to ensure smooth operation in sub-zero temperatures.

Additional modifications include embedded heating elements in the windshield to clear frost during harsh winters. Triple-layered windscreens with heating filaments provide clear visibility for the driver, even during snowfall. These enhancements make the train capable of operating efficiently in temperatures as low as -30°C.

The Railways has completed the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, spanning 272 kilometers—(KNO)

Previous Post

Army Troops Exchange Fire with Terrorists in Kathua; Search Operation Underway

Next Post

Woman burnt to death, husband injured in Bandipora fire mishap

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Next Post
KI News

Woman burnt to death, husband injured in Bandipora fire mishap

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.