• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, September 8, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

SSCL clarifies Urdu daily’s Article on ‘Pace of Work by SSC’

KI News by KI News
April 16, 2024
in CITY & TOWNS
A A
0
KI News
FacebookTwitterWhatsapp

SRINAGAR: The Srinagar Smart City Limited (SSCL) Authorities today issued a clarification in response to the news article by a local Urdu daily on the pace of work by Srinagar Smart City (SSC).

As per an official handout issued here, it has been given out that the SSCL is implementing 168 projects of which 90 are completed amounting to approximately 450Cr, and 68 projects are ongoing worth another 490Cr.

Related posts

IMCT reviews flood damages, relief and rehabilitation measures in south Kashmir districts

IMCT reviews flood damages, relief and rehabilitation measures in south Kashmir districts

September 8, 2025
Dy CM reviews status of restoration work of road infrastructure, NHs across J&K

Dy CM reviews status of restoration work of road infrastructure, NHs across J&K

September 8, 2025

Downtown is an extremely important area in Srinagar and SSCL is currently implementing public space improvement and street improvement projects of length more than 25km, among other illumination and facade improvement projects.

The mentioned projects of Dalgate Gojwara road are being implemented at a cost of 25 Cr and the street improvements in Bohri Kadal, Maharaj Bazaar and Ali Kadal area are worth 50 Cr. All of the above projects are more than 60% complete and shall be completed before June 2024, read the statement.

Habba Kadal was recently inaugurated as one of the flagship projects in downtown Srinagar. ‘All the ongoing projects are happening as per schedule and are expected to be completed before June 2024’ was mentioned in the official handout.

SSCL works have been meticulously planned and implemented diligently with work going on in the day as well as the night in two shifts. The comprehensive infrastructure works are being carried out downtown that includes not just road surface, but rationalizing drainage, sewerage, communications and electricity, which in the long run shall make the life of the residents easier and more comfortable.

Infrastructure works may cause some inconvenience to shoppers and residents as underground works require digging. But the works are proceeding on time and SSCL is creating better footpaths, on-street parking, signage, proper drain works, road works, lighting, and geometric improvements, added the statement.

Previous Post

Egg donated for mosque construction fetches over Rs 2.26 lakh in auction

Next Post

Mandeep Kour visits LCMA’s development projects

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Next Post
Mandeep Kour visits LCMA’s development projects

Mandeep Kour visits LCMA’s development projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.