• About us
  • Contact us
  • Our team
  • Terms of Service
Saturday, February 14, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

“Another milestone”: ISRO rocket accomplishes zero orbital debris mission

Press Trust of india by Press Trust of india
March 26, 2024
in TOP NEWS
A A
0
ISRO announces Young Scientist Prog-2024
FacebookTwitterWhatsapp

Bengaluru: ISRO on Monday said its Polar Satellite Launch Vehicle (PSLV) has accomplished zero orbital debris mission, and described it “another milestone”.

This was achieved on March 21, when the PSLV Orbital Experimental Module-3 (POEM-3) met its “fiery end” through a re-entry into the Earth’s atmosphere.

More News

UNSC panel notes Pak-based terror group JeM’s reported link to Red Fort attack

NIA Court sentences two LeT OGWs to 15 years for aiding Pakistani terrorist in Kashmir

Jammu Master Plan-2032 stalled over zoning rectification, data verification: CM Omar Abdullah

Load More

“The PSLV-C58/XPoSat mission has practically left zero debris in orbit,” the space agency said.

The PSLV-C58 mission was accomplished on January 1.

According to ISRO, after completing the primary mission of injecting all satellites into their desired orbits, the terminal stage of PSLV was transformed into a 3-axis stabilised platform, the POEM-3.

The stage was deorbited from 650 km to 350 km, which facilitated its early re-entry, and was passivated to remove residual propellants to minimise any accidental break-up risks, it said.

POEM-3 was configured with a total of nine different experimental payloads to carry out technology demonstrations and scientific experiments on the newly developed indigenous systems. Out of these, six payloads were delivered by Non-Government Entities (NGEs) through Indian National Space Promotion and Authorization Centre (IN’?SPACe).

The mission objectives of these payloads were met in a month.

The orbital altitude of the upper stage continued to decay under the influence of natural forces, primarily atmospheric drag with the module (NORAD ID 58695) expected to have impacted the North Pacific Ocean (Lat 6.4 N & Long 158.7 W) on March 21, 2024, at 14:04 UTC (19:34 Hrs. IST), ISRO said.

Through the POEM, which serves as a very cost-effective platform for carrying out short-duration space-borne experiments, ISRO has opened up new vistas for academia, startups, and NGEs to experiment with their new payloads, it said.

This novel opportunity has been effectively utilised by numerous startups, universities, and NGEs for carrying out experiments in space, which included electric thrusters, satellite dispensers, and star-tracking.

POEM also incorporates new features such as total avionics in single-chain configuration, industrial-grade components in avionics packages including Mission Management Computer, standard interfaces for electric power, telemetry & telecommand, and new in-orbit navigation algorithms making use of rate-gyro, sun sensor, and magnetometer, the space agency said.

For the effective conduct of experiments onboard in POEM-3, the body rates were stabilised to less than 0.5 deg/s throughout, and innovative schemes like controlled dumping of residual propellant after the main mission were introduced for minimizing disturbances due to passivation, it added.

Noting that the Vikram Sarabhai Space Centre (VSSC) has taken the lead in conceptualising and realising the POEM by augmenting the 4th stage of PSLV, ISRO said PSLV-C58/XPoSat is the third such mission in the series, with POEMs being successfully scripted each time.

The payload operations were carried out effectively by the spacecraft operations team from the mission operations complex (MOX) at ISRO Telemetry Tracking and Command Network (ISTRAC) and ISRO’s System for Safe and Sustainable Spacecraft Operations Management (IS4OM) has been monitoring and analysing the orbital decay all through, it said. Till near re-entry, POEM-3 was tracked by ISTRAC ground stations.

The Multi-Object Tracking Radar (MOTR) at Shriharikota also tracked the PS4 stage till the morning of March 21. POEM-3 was also supported by other Centres like U R Rao Satellite Centre (URSC), Liquid Propulsion Systems Centre (LPSC) and ISRO Inertial Systems Unit (IISU).

ISRO said it will continue its commitment to providing a cost-effective orbital experiment platform, as the growing menace due to space debris, especially with multiple small satellite constellations coming up, poses a significant threat to space activities, including satellite launches, human spaceflight, and space exploration missions.

ISRO, being a responsible space agency, is committed to mitigating this threat through the development and implementation of advanced debris tracking systems, space-object deorbiting technologies, and responsible satellite deployment practices, thus safeguarding orbital environments for present and future space endeavors, it added.

Previous Post

27 detained in Jammu for consuming alcohol at public places on Holi

Next Post

PDD employees stage silent protest in Sgr

Press Trust of india

Press Trust of india

Related Posts

UNSC panel notes Pak-based terror group JeM’s reported link to Red Fort attack

UNSC panel notes Pak-based terror group JeM’s reported link to Red Fort attack
February 14, 2026

United Nations: A report by the UN Security Council sanctions monitoring team has noted that Pakistan-based terror group Jaish-e-Mohammed was...

Read moreDetails

NIA Court sentences two LeT OGWs to 15 years for aiding Pakistani terrorist in Kashmir

NIA arrests key accused in J&K ‘narco-terror nexus’ case
February 14, 2026

New Delhi: A Special Court of the National Investigation Agency (NIA) in Delhi on Friday sentenced two overground workers (OGWs)...

Read moreDetails

Jammu Master Plan-2032 stalled over zoning rectification, data verification: CM Omar Abdullah

Regularisation of daily wagers this year; free LPG cylinders UT-funded, rural economy gets major push: CM Omar Abdullah unveils Budget roadmap
February 14, 2026

Jammu: The Jammu and Kashmir government on Friday said final approval of the Jammu Master Plan-2032 has been delayed due...

Read moreDetails

Assembly passes grants for Jal Shakti, forest, tribal affairs deptts

Budget Session 2026: Discussion on Motion of Thanks continues for second day
February 14, 2026

Jammu: The Jammu and Kashmir Assembly on Friday passed grants worth Rs 3,241.77 crore for public health engineering, Rs 1,524.82...

Read moreDetails

Public health can’t be compromised: J&K Assembly speaker on rotten-meat issue

J&K Assembly passes Motion of Thanks on LG’s address
February 14, 2026

Jammu: Jammu and Kashmir Assembly Speaker Abdul Rahim Rather urged the government on Friday to strengthen the legal framework to...

Read moreDetails

Court grants interim relief to Sandeep Mawa, restrains circulation of ‘defamatory’ content in ₹1,100-crore suit

City court convicts 2 persons in acid attack case
February 14, 2026

Srinagar: A court here on Thursday granted interim relief to Sandeep Mawa in a civil defamation suit seeking ₹1,100 crore...

Read moreDetails
Next Post
KI News

PDD employees stage silent protest in Sgr

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.