• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, September 10, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home Latest News

Jmu-Sgr highway blocked for second day due to landslides

KI News by KI News
February 20, 2024
in Latest News
A A
0
Landslides block Jmu-Sgr highway
FacebookTwitterWhatsapp

Banihal: The Jammu-Srinagar national highway remained blocked for the second day on Tuesday following landslides at over a dozen places in Ramban district, Traffic department officials said.

The inclement weather is hampering the road clearance operations at the affected areas between Ramban and Banihal, the officials said, advising people to avoid taking the road till further updates.

Related posts

About a dozen villages severely hit by flash floods, landslides: Div Com Jammu

12,000 km of road length damaged due to floods, landslides in J&K

September 10, 2025
Mud, snow slide in Kupwara: Beacon official succumbed to injuries

Avalanche at Siachen base camp kills 3 soldiers

September 10, 2025

“The Jammu-Srinagar National highway (NH-44) is blocked due to Landslides/Mudslides/shooting stones (from hillocks) at Dalwas, Peerha, near Peerha Tunnel, Mehad-Cafeteria, Jaiswal bridge, Trishul Morh, Seri, T2, Monkey Morh, Mom Passi, Gangroo, Hingni Marog, Kishtwari Pather, Shalghari Rampari, Tabela and Chamalwas,” a Traffic department spokesperson said.

He said the road clearance operations have also been impeded by the third straight day of rain.

On Monday also, a traffic department official said the traffic on the 270-km highway was suspended around 9.30 am following landslides triggered by heavy rains in Dalwas, Mehad-Cafeteria, Chamalwas, Shalgadi and Gangroo.

A Meteorological department spokesman said the Banihal town along the highway received 83.6 mm of rainfall during the 24 hours ending 8.30 am Tuesday.

Bhaderwah in Doda district received a rainfall of 58.8 mm followed by Batote in Ramban (49.6 mm), the spokesman said, adding Katra town – the base camp for pilgrims visiting Mata Vaishno Devi shrine in Reasi district – recorded 16.2 mm during the period.

The Jammu city received a rainfall of 5.8 mm rainfall till 8.30 am, the spokesman said, forecasting widespread rains at most places during the day followed by isolated rains till February 25 except February 23.

 

 

 

Previous Post

Unidentified body recovered in Budgam

Next Post

PM Modi reaches Jammu to inaugurate various projects, address rally

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Next Post
PM Modi reaches Jammu to inaugurate various projects, address rally

PM Modi reaches Jammu to inaugurate various projects, address rally

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.