• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, August 29, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Div Com reviews power scenario in Kashmir

Images News Netwok by Images News Netwok
December 20, 2023
in TOP NEWS
A A
0
Div Com reviews power scenario in Kashmir
FacebookTwitterWhatsapp

Srinagar: Divisional Commissioner (Div Com) Kashmir, Vijay Kumar Bidhuri Tuesday convened a meeting of Kashmir Power Distribution Corporation Limited (KPDCL) to review the power scenario in the Kashmir division.

According to an official press release, addressing the meeting of officers, the Div Com directed the concerned to act humanely in event of harsh cold climatic conditions and replace the damaged Distribution Transformer (DT) to ease peoples’ sufferings.

Related posts

Water starts receding in Jhelum, flood threat eases, BUT…

Water starts receding in Jhelum, flood threat eases, BUT…

August 29, 2025
   Two killings/deaths in J&K, people want answers

4 more bodies found as post-flood rescue work continues in Jammu

August 29, 2025

The meeting was attended by Deputy Commissioner Srinagar, Managing Director, KPDCL; Chief Engineer KPDCL/ KPTCL, Generation/ Planning and Procurement Kashmir and other concerned officers in person, besides all Deputy Commissioner’s of Kashmir division through video conferencing.

At the outset the MD KPDCL briefed the meeting about the power scenario in Kashmir through a PowerPoint presentation which includes average demand met; maximum demand un-restricted and average curtailment. He informed that there has been no distress cut after additional allocation of 200 MWs of power across Kashmir Valley.

The Div Com reviewed district wise details of average curtailment hours in metered and non-metered both in urban and rural areas of Kashmir division.

Meeting also discussed the present Distribution Transformer Buffer status of KPDCL and replacement time. The Div Com directed the concerned to ensure sufficient buffer stock of DTs in each district and simultaneously it should also be ensured that different capacities of DTs are in buffer to replace equal capacity of DTs.

It was informed that the average time taken to repair the damaged transformers has been reduced, with restoration time of less than 12 hours in urban areas and in a day in rural areas.

The meeting also reviewed the status of smart metering under PMDP-U phase-I and II.

The Div Com sought the feedback of damaged DTs on a daily basis to his office besides where replacement has taken more than one day.

He also directed the DCs and other concerned to launch drives against the power thefts vigorously to prevent pilferage.

Previous Post

J&K’s Abid Mushtaq clinches IPL spot in 2024 auction

Next Post

11 earthquakes rattle J&K, Ladakh in 24 hours

Images News Netwok

Images News Netwok

Next Post
Mild earthquake jolts JK

11 earthquakes rattle J&K, Ladakh in 24 hours

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.