• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, August 27, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home NATION

No progress since Thursday, drilling to resume shortly: NDMA on Silkyara tunnel rescue ops

Press Trust of india by Press Trust of india
November 24, 2023
in NATION
A A
0
No progress since Thursday, drilling to resume shortly: NDMA on Silkyara tunnel rescue ops
FacebookTwitterWhatsapp

New Delhi: National Disaster Management Authority (NDMA) on Friday said no further progress has been made since Thursday in drilling through the debris at the Silkyara tunnel in Uttrakhand to rescue 41 trapped workers but assured that the drilling by auger machine will start soon.

The drilling process was stopped on Thursday because of obstructions, but the repair work is being done to restart the process, using an auger machine, shortly.

Related posts

Army gives artificial limbs to 24 persons with disabilities along LoC in Poonch

August 26, 2025
PIL in Delhi HC to see feasibility of holding Lok Sabha, assembly elections together

Delhi HC sets aside CIC order to disclose PM Modi’s degree details, says ‘personal info’

August 26, 2025

“By any means”, the trapped workers will be rescued as all resources are being used, said NDMA member Lt Gen (retd) Syed Ata Hasnain while briefing media on rescue operations.

There has been no progress in the movement of pipe through debris in the tunnel since Thursday, and about 15 metres of drilling is still left to reach the stranded workers, he added.

Giving details of the operations, he said that provided there are no obstacles, the auger machine should be able to drill about 4-5 metres in an hour.

Hasnain also advised the media not to speculate on the timeline for completion of the rescue operations as it creates a wrong perception.

“It is a difficult and challenging operation,” he added.

The NDMA member also said all the workers are safe, and their relatives, Union Minister VK Singh and Uttrakhand Chief Minister Pushkar Singh Dhami have spoken to them.

Drilling through the rubble to prepare an escape route for the 41 workers trapped inside the Silkyara tunnel was set to resume on Friday morning, a day after another snag hit the rescue efforts.

On Thursday, boring through the rubble was put on hold again, apparently after cracks appeared in the platform on which the drilling machine rests.

The dampener came hours after the operation resumed earlier in the day, following a six-hour delay to cut through an iron girder that came in the way of the auger machine late Wednesday night.

Hasnain also said central agencies and several state governments are actively involved in the rescue operations.

The men have been trapped for the past 12 days after a portion of the under-construction tunnel on the Uttarakhand Char Dham route collapsed, cutting off its exit.

Previous Post

Rajasthan all set for battle royale Saturday

Next Post

Rashid Khan undergoes lower-back surgery

Press Trust of india

Press Trust of india

Next Post
Rashid Khan´s four-for helps Afghanistan clinch T20 series

Rashid Khan undergoes lower-back surgery

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.