• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, August 26, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home NATION

Rescue operation challenging, every possible method being tried for speedy evacuation: Union minister Gadkari

Press Trust of india by Press Trust of india
November 19, 2023
in NATION
A A
0
Rs 3397 Cr sanctioned for two road projects in J&K

Nitin Gadkari

FacebookTwitterWhatsapp

Uttarkashi (Uttarakhand): Whatever is required to save the 41 trapped workers will be done and keeping the morale of workers and their family members high should be everyone’s collective responsibility, Union minister Nitin Gadkari said on Sunday as he reviewed the rescue operation at the partially collapsed Silkyara tunnel.

The minister for road transport and highways, who was accompanied by Uttarakhand Chief Minister Pushkar Singh Dhami, said the rescue operation is challenging as the soil strata in the Himalayan region is not uniform.

Related posts

Army gives artificial limbs to 24 persons with disabilities along LoC in Poonch

August 26, 2025
PIL in Delhi HC to see feasibility of holding Lok Sabha, assembly elections together

Delhi HC sets aside CIC order to disclose PM Modi’s degree details, says ‘personal info’

August 26, 2025

It is soft at some places and hard at other places which makes any mechanical operation difficult, he said.

Horizontal drilling with the American auger is the quickest method in the given circumstances to reach the trapped workers, Gadkari said.

“American auger was working alright when it was drilling through soft soil. It faced some problems after it encountered some hard obstacle that led to the machine applying greater pressure and creating vibrations following which it was stopped for safety reasons,” he said at a press conference in Silkyara.

“We are working on six options simultaneously. The PMO is also closely monitoring the operation. Our biggest priority is to save all those who are trapped and as soon as possible. Whatever is needed will be done,” he said.

Whichever machine or technical assistance is required will be provided, he said.

“Keeping up the morale of the trapped workers and their family members should be everyone’s collective responsibility at the moment,” he said.

He said the trapped workers are being constantly provided oxygen, electricity, food, water and medicines.

Apart from one pipeline through which they were supplied food earlier, an alternative larger-diametre  pipeline has also been inserted  up to 42 metres through the rubble so that food like roti, vegetables and rice apart from light food could also be supplied to them, he said,

Road, Transport and Highways Secretary Anurag Jain also said that multivitamins, antidepressants and dry fruits are being provided to the 41 workers trapped for the past seven days.

“Fortunately, there is light inside because the electricity is on. There is a pipeline, and thus water is available. There is a 4-inch pipe, which was used for compression. Through that, we are sending food from day 1,” he said.

Jain, in a video brief update on the rescue operation, further said there is water and electricity in two km portion inside the tunnel, which is the finished part of the 4.531-kilometre two lane bi-directional tunnel at Silkyara in Uttarkashi.

Experts from different fields have been pooled in and asked to suggest whatever methods can be applied to ensure the safe and early evacuation of the trapped workers, Gadkari said.

Preparations are on to start vertical drilling through the hill above the tunnel, he said, adding every possible method is being tried for their speedy evacuation.

Gadkari said tunnels at a cost of approximately Rs 2.75 lakh crore are being built by the Centre in Jammu and Kashmir, Himachal Pradesh and Uttarakhand. 

Previous Post

J&K’s Power Quandary: From Potential to Darkness

Next Post

At least 30 premature babies evacuated from Gaza’s main hospital and will be transferred to Egypt

Press Trust of india

Press Trust of india

Next Post
Thousands flee Gaza’s main hospital but hundreds, including babies, still trapped by fighting

At least 30 premature babies evacuated from Gaza's main hospital and will be transferred to Egypt

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.