• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, November 19, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home WORLD

Beginning 2023, India to start building nuclear power plants in ‘fleet mode’

Press Trust of india by Press Trust of india
March 27, 2022
in WORLD
A A
0
Beginning 2023, India to start building nuclear power plants in ‘fleet mode’
FacebookTwitterWhatsapp

New Delhi:  With the first pour of concrete for a 700 MW atomic power plant in Karnataka’s Kaiga scheduled in 2023, India is set to put in motion construction activities for 10 ‘fleet mode’ nuclear reactors over the next three years.

The first pour of concrete (FPC) signals the beginning of construction of nuclear power reactors from the pre-project stage which includes excavation activities at the project site.

More News

Bangladesh’s interim govt urges India to extradite Sheikh Hasina, her aide

PM Modi will not address General Debate at high-level UNGA session

Looks like we lost India, Russia to ‘darkest’ China: US President Trump

Load More

“The FPC of Kaiga units 5&6 is expected in 2023; FPC of Gorakhpur Haryana Anu Vidyut Praiyonjan units 3 & 4 and Mahi Banswara Rajasthan Atomic Power Projects units 1 to 4 is expected in 2024; and that of Chutka Madhya Pradesh Atomic Power Project units 1 & 2 in 2025,” officials of the Department of Atomic Energy (DAE) told the Parliamentary panel on science and technology.

The Centre had approved construction of 10 indigenously developed pressurised heavy water reactors (PHWR) of 700 MW each in June 2017. The ten PHWRs will be built at a cost of Rs 1.05 lakh crore.

It was for the first time that the government had approved building 10 nuclear power reactors in one go with an aim to reduce costs and speed up construction time.

Bulk procurement was underway for the fleet mode projects with purchase orders placed for forgings for steam generators, SS 304L lattice tubes and plates for end shields, pressuriser forgings, bleed condensers forgings, incoloy-800 tubes for 40 steam generators, reactor headers, DAE officials said.

Engineering, procurement and construction package for turbine island has been awarded for Gorakhpur units three and four and Kaiga units five and six, they added.

Under the fleet mode, a nuclear power plant is expected to be built over a period of five years from the first pour of concrete.

Currently, India operates 22 reactors with a total capacity of 6780 MW in operation. One 700 MW reactor at Kakrapar in Gujarat was connected to the grid on January 10 last year, but it is yet to start commercial operations.

The PHWRs, which use natural uranium as fuel and heavy water as moderator, have emerged as the mainstay of India’s nuclear power programme.

India’s first pair of PHWRs of 220 MW each were set up at Rawatbhata in Rajasthan in the 1960s with Canadian support. The second reactor had to be built with significant domestic components as Canada withdrew support following India’s peaceful nuclear tests in 1974.

As many as 14 PHWRS of 220 MW each with standardised design and improved safety measures were built by India over the years.

Indian engineers further improvised the design to increase the power generation capacity to 540 MWe, and two such reactors were made operational at Tarapur in Maharashtra.

Further optimisations were carried out to upgrade the capacity to 700 MWe.

Previous Post

Rocket attacks hit Ukraine’s Lviv as Biden visits Poland

Next Post

Jaishankar formally hands over Coastal Radar System to Maldives

Press Trust of india

Press Trust of india

Related Posts

Bangladesh’s interim govt urges India to extradite Sheikh Hasina, her aide

Ahead of polls, Hasina announces to build 560 model mosques, Islamic university in B’desh
by Press Trust of india
November 17, 2025

Dhaka: Bangladesh's interim government on Monday urged India to immediately extradite deposed prime minister Sheikh Hasina and her former home...

Read moreDetails

PM Modi will not address General Debate at high-level UNGA session

PM Modi, senior ministers take oath as members of 18th Lok Sabha
by Press Trust of india
September 6, 2025

United Nations: Prime Minister Narendra Modi will not address the General Debate at the annual high-level session of the United...

Read moreDetails

Looks like we lost India, Russia to ‘darkest’ China: US President Trump

Sweeping Trump tariffs draw dismay, calls for talks from countries around globe
by Press Trust of india
September 5, 2025

Washington:  It looks like the US has lost India and Russia to "darkest" China, President Donald Trump said on Friday...

Read moreDetails

Putin chides Trump for using colonial era tactics to pressure leaders of India, China

Global leaders including Putin condole Vajpayee’s death
by Press Trust of india
September 4, 2025

Beijing: Russian President Vladimir Putin has reprimanded his US counterpart Donald Trump for attempting to exert colonial-era pressure tactics on...

Read moreDetails

Trump’s personal rapport with Modi ‘gone now’, says former US NSA Bolton

Trump’s personal rapport with Modi ‘gone now’, says former US NSA Bolton
by Press Trust of india
September 4, 2025

New York/Washington: President Donald Trump had a very good personal relationship with Prime Minister Narendra Modi, but “that's gone now”,...

Read moreDetails

Earthquake in eastern Afghanistan kills at least 610 people, injures 1,300

Mild earthquake jolts JK
by AP/ PTI
September 1, 2025

Kabul: An earthquake in Afghanistan's east has killed at least 610 people and injured 1,300, a spokesman for the Taliban...

Read moreDetails
Next Post
234 Indians stranded in Iran have arrived in India: Jaishankar

Jaishankar formally hands over Coastal Radar System to Maldives

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.