• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, January 20, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

DC Sgr for early operationalization of pediatric hospital at Bemina

Images News Netwok by Images News Netwok
January 13, 2022
in CITY & TOWNS
A A
0
DC Sgr for early operationalization of pediatric hospital at Bemina
FacebookTwitterWhatsapp

Srinagar: In order to review the pace and progress of the works being carried out on Rs 114.81 crore project for construction of 500 bedded pediatric Hospital, at Bemina, the Deputy Commissioner Srinagar Thursday chaired a meeting here in his Office Chamber.

Chief Planning Officer, Srinagar, Yasin Lone, Medical Superintendent G B Panth Hospital Dr Nazir Choudhary, Superintendent, Head of Paediatrics, G B Panth, Engineers of R&B, PDD, PHE and MED, besides other concerned Officers were present in the meeting.

More News

Mission YUVA gains momentum with 95% Panchayat coverage, ₹847 Cr loans to 14,887 applicants

KCCI Delegation, JDU Leader call on Lt Governor

CS finalises timelines for implementation of next-gen EoDB reforms in J&K

Load More

During the meeting, the officers apprised the Deputy Commissioner about the component wise status of works in the Hospital.

The Deputy Commissioner was informed that most of the civil, electric and mechanical works have been completed and the project is in the final and finishing phase.

With regard to the civil works, the Superintendent Engineer R&B informed that 90 percent works have been completed and remaining civil works will be completed by the end of this month.

The Superintendent Engineer Mechanical Engineering Department apprised the chair that all mechanical components including 3 Medical Oxygen plants of 1000 lpm capacity each, Lifts, Central Heating System, Fire Fighting equipments and Laundry unit are already in place and tested successfully, while work on STP is being carried out which shall be completed within next two months.

The DC directed the Mechanical Engineering Department to speed up the pace of work to ensure STP in the hospital is completed within the set deadline. He also directed them to make some immediate interim arrangements for STP till the main work on STP is completed.

While taking stock of electric supply to the hospital, the DC was informed that a 1.6 MVA transformer is being installed in the hospital premises and shall be made operational by 15th of February to ensure uninterrupted reliable power supply.

On the occasion, the Medical Superintendent, G B Panth Hospital requisitioned for additional 40 kanals of land for housing residential quarters of Doctors and other paramedical staff of the Hospital, besides for parking facility. He also demanded that an overhead footbridge be constructed near the hospital site to ensure safety of the visiting patients and attendants while crossing the bypass road.

For allocation of additional land, the DC asked him to place an indent so that the matter is taken up with concerned quarters for early allotment for the said purpose. With regard to construction of the overhead footbridge, the DC asked for the preparation of a separate DPR so that demand is met.

The Deputy Commissioner stressed all the concerned to work in proper coordination to ensure vital pediatric facilities on modern lines are made available in the District which will be equipped with all modern equipment for managing the high risk pediatric cases.

He said once the Hospital is made operational it will strengthen the pediatric care facilities in Kashmir division, ease the burden of patient load on the existing tertiary level hospital, and ensure quality maternity, neonatal and pediatric care to the patients.

Previous Post

Director SCERT reviews ongoing activities of SCERT across J&K

Next Post

DCCRK issues training schedule for MOs regarding PCCCs

Images News Netwok

Images News Netwok

Related Posts

Mission YUVA gains momentum with 95% Panchayat coverage, ₹847 Cr loans to 14,887 applicants

Chief Secy calls for early screening and treatment to make J&K TB-free
January 20, 2026

JAMMU: Chief Secretary, Atal Dulloo, today chaired a meeting of the Apex Committee of Mission YUVA, during which he reviewed...

Read moreDetails

KCCI Delegation, JDU Leader call on Lt Governor

KCCI Delegation, JDU Leader call on Lt Governor
January 20, 2026

SRINAGAR: A delegation of the Kashmir Chamber of Commerce and Industry, led by its President Javid Ahmed Tenga, today called...

Read moreDetails

CS finalises timelines for implementation of next-gen EoDB reforms in J&K

CS reviews upgradation of infrastructure and services in health sector
January 20, 2026

JAMMU: Chief Secretary, Atal Dulloo, today chaired a high-level meeting of Administrative Secretaries to finalise timelines for implementation of the...

Read moreDetails

Legal Metrology–OMCs Meet held at Jammu

Legal Metrology–OMCs Meet held at Jammu
January 20, 2026

JAMMU: A coordination meeting of Oil Marketing Companies (OMCs) and the Legal Metrology Department was held today at the Jammu...

Read moreDetails

Sanjeev Verma inaugurates painting camp on “My India, My Vote” at Kala Kendra Jammu

January 20, 2026

JAMMU: Chief Electoral Officer, J&K, Sanjeev Verma, today inaugurated a three-day painting camp on the theme “My India, My Vote” ...

Read moreDetails

Div Com Kashmir finalises arrangements for Republic Day celebrations

January 20, 2026

SRINAGAR: Ensure meticulous and befitting arrangements for the celebration of the national festival, Divisional Commissioner Kashmir, Anshul Garg, to officers...

Read moreDetails
Next Post
H&ME dept identifies posts for NHM contractual Covid nurses

DCCRK issues training schedule for MOs regarding PCCCs

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.