• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, August 28, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Baseer Khan visits city shrines, inspect works undertaken by tourism dept

Images News Netwok by Images News Netwok
June 28, 2021
in CITY & TOWNS
A A
0
Baseer Khan visits city shrines, inspect works undertaken by tourism dept
FacebookTwitterWhatsapp

Srinagar: Advisor to Lieutenant Governor, Baseer Ahmad Khan, today visited different shrines here to take stock of various developmental projects being undertaken under centrally sponsored Pilgrimage Rejuvenation and Spirituality Augmentation Drive (PRASAD) scheme.

The Advisor was accompanied by Director Tourism, Executive Engineer Tourism and officers of JKPCC and Wakf Board.

Related posts

LG thanks Centre for sanctioning 316 road projects under PMGSY

LG chairs high-level meeting to review rescue & relief operations

August 27, 2025
CM chairs high-level meeting on relief and restoration measures in Jammu

CM chairs high-level meeting on relief and restoration measures in Jammu

August 27, 2025

The Advisor maintained that the Lieutenant Governor is keen to see all these developmental projects completed soon. He directed them augment the men and machinery on works so that the projects are completed at an earliest.

On visiting Dargah Hazratbal the Advisor inspected the works carried out for beautification of Gate and Ornamental fencing carried out by the Tourism department. The Advisor asked the officers to complete the works before the end of next month and directed them to stick to the timeline strictly. He also inspected the wuzu khana (ablution centre) and asked them to make it functional within 15 days by connecting it to the reliable water supply.

The Advisor was informed that the work on gate is 85% complete and that of fencing is 90%. He was apprised that the work on devri (finished stone) path would also be taken in hand and completed forthwith. It was also given out that the wuzu khana has 40 numbers of ablution stalls distributed separately for gents and females with different entrances for both the genders.

The Advisor also visited the construction site of multi level parking at Hazratbal shrine. He was informed by the site engineers that it is a G+3 structure with a capacity for parking of 164 vehicles. The Advisor directed them to complete it before the year ending. He said that the facility is going to streamline the traffic on this busy route especially on the auspicious days of Eid Milad and other festivals.

The Advisor directed the Wakf Board officers to have the beautification of the surroundings done by aesthetically landscaping the area around the Hazratbal shrine.

While visiting the Gurudwara Chatti Padshahi, Rainawari the Advisor asked the Director to accommodate the demands of the Gurudwara committee so that the religious shrine has all the facilities available to make the devotees comfortable.

He asked them to complete the canopy work forthwith and invite tenders in a week’s time for other beautification works like parking lot, devri path, illumination and khatambandh. He urged upon them to complete all the works within three months.

At Khan-kahi- Moulla sufi shrine the Advisor was informed that the papermachie work has been completed and the exterior facilities are being augmented. It was given that the project’s estimated cost is about Rs 4.15 crore.

The Advisor asked them to install all the fire fighting equipments like fire hydrants, smoke alarms besides lightening conductors in the shrine so that the heritage site remains safe from any accidental damage.

He advised the officers to look for acquisition of the land and building in front of the gate and explore options for relocation of electric transformer there. He asked them to develop the ghat on the river flowing behind the shrine so that devotees take the benefit of water transport facility to be started soon.

The Advisor was assured that all of the facilities would be developed as per the desired instructions and timelines will be strictly adhered to.

Previous Post

Shahar-e-Khas suffering due to govt’s callous neglect: Sagar

Next Post

17.5 lakh boys & girls to be engaged in sports activities across J&K this year: LG

Images News Netwok

Images News Netwok

Next Post
17.5 lakh boys & girls to be engaged in sports activities across J&K this year: LG

17.5 lakh boys & girls to be engaged in sports activities across J&K this year: LG

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.