• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, December 21, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

BRO to facilitate troop movement in Ladakh

Press Trust of india by Press Trust of india
January 13, 2021
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Leh: The Border Roads Organisation has launched a special snow-clearing operation to keep strategic roads and passes open for troop movement amid the tension along the Line of Actual Control (LAC), officials said, as the force’s personnel brave freezing temperatures and intimidating altitudes to keep communication lines opened.

BRO officials said the organisation has launched project ‘Himank’ to undertake the arduous and daunting task of keeping the strategically important roads along the LAC open even though that meant maneuvering some of the highest mountain passes in the world and working in temperatures going down to minus 35 degrees Celsius.

More News

LG calls for frequent checking, surveillance of prisons

Eggs safe for consumption, cancer risk claims unfounded: FSSAI

Measures in place to tackle heavy snowfall, says CM

Load More

“Winter snow clearance task this year has been particularly more challenging considering the altitude, extreme weather and the heavy deployment of the troops along the LAC,” a senior BRO official said.

Officials said that BRO personnel deployed at altitudes ranging from 16,500-18,000 feet are relentlessly executing the winter snow-clearance.

They said the strategically important road axes and prominent mountain passes where the snow-clearance operations are carried out include Chang la, Warila, Marshimikla , Kajukondla, Kassangla, Umlingla, besides the Durbuk-Shyok-Daulat Beig Oldie Road.

During the winters, the only existing road axis connecting DBO in Sub Sector North, Hot Spring  and Chushul in  Eastern Ladakh, and gateway to Changthang Sector of Ladakh (via Changhla and Warila passes) gets blocked due to heavy accumulation of snow.

Officials said that to provide sustenance to troops deployed in these areas amid the tension with China, road construction companies are working tirelessly to keep the roads open and ensure connectivity all through the winter.

“To keep the roads open, meticulous  planning  and resources mobilisation were undertaken and adequate advance winter stocking including that of equipment spares and winter diesel was done,” one of them said.

Previous Post

J&K witnessed positive changes in past two years: DGP

Next Post

65% physical work on Z-MORH tunnel completed: Div Com

Press Trust of india

Press Trust of india

Related Posts

LG calls for frequent checking, surveillance of prisons

LG calls for frequent checking, surveillance of prisons
by Images News Netwok
December 21, 2025

Jammu: Lt Governor Manoj Sinha on Saturday called for frequent checking and surveillance of prisons across Jammu and Kashmir at...

Read moreDetails

Eggs safe for consumption, cancer risk claims unfounded: FSSAI

Eggs safe for consumption, cancer risk claims unfounded: FSSAI
by Press Trust of india
December 21, 2025

New Delhi: The Food Safety and Standards Authority of India (FSSAI) has categorically dismissed recent claims linking eggs to cancer...

Read moreDetails

Measures in place to tackle heavy snowfall, says CM

Measures in place to tackle heavy snowfall, says CM
by Images News Netwok
December 21, 2025

Srinagar: Chief Minister Omar Abdullah said all arrangements are in place to tackle heavy snowfall in the Union territory, also...

Read moreDetails

NIA court issues non-bailable warrant against Hizbul Mujahideen chief

NIA arrests key accused in J&K ‘narco-terror nexus’ case
by KI News
December 21, 2025

Srinagar:  An NIA special court in Budgam district on Saturday issued a non-bailable warrant against Pakistan-based Hizbul Mujahideen chief Mohammad...

Read moreDetails

Snow, rain likely to welcome ‘Chillai-Kalan’

Snow, rain likely to welcome ‘Chillai-Kalan’
by Images News Netwok
December 21, 2025

Srinagar: Kashmir is likely to face a spell of wet weather, including moderate to heavy snowfall in the higher reaches,...

Read moreDetails

FCI’s first foodgrain freight train to reach south Kashmir goods terminal on Sunday

FCI’s first foodgrain freight train to reach south Kashmir goods terminal on Sunday
by Press Trust of india
December 21, 2025

Jammu: The first foodgrain freight train of the Food Corporation of India (FCI) from Punjab is scheduled to reach the...

Read moreDetails
Next Post
65% physical work on Z-MORH tunnel completed: Div Com

65% physical work on Z-MORH tunnel completed: Div Com

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.