• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, March 5, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Banihal-Qazigund Tunnel likely to complete by March

Images News Netwok by Images News Netwok
January 4, 2021
in TOP NEWS
A A
0
Banihal-Qazigund Tunnel likely to complete by March
FacebookTwitterWhatsapp

Banihal: The work on the double tube 8.5-km-long Banihal-Qazigund tunnel along the 270-km Jammu-Srinagar national highway is nearing completion and is likely to open for traffic in March.

The work on the Rs 2100-crore project started in June 2011 by Navyuga engineering company and on completion would reduce the road distance between Banihal in Jammu province and Qazigund in south Kashmir by 16 km from the present 35 km and will bypass Jawahar Tunnel and Shaitan Nalla, which is prone to heavy snowfall and slippery conditions during winters.

More News

CM, religious leaders, civil society members appeal for peace

Precautionary restrictions to continue on Thursday

Court rejects ED’s plea to add fresh charges against Farooq Abdullah, five others JKCA ‘fund misappropriation’ case

Load More

“The work within and outside is in the final stage and we are hopeful to throw it open for traffic in the last week of March,” Chief Manager, Navayuga Engineering Company, Muneeb Tak told PTI.

The existing road tunnel below the Banihal pass (Jawahar tunnel — the gateway to Kashmir) has been a bottleneck on the nearly 265-km highway, the only all weather road linking Kashmir with the rest of the country, due to its elevation of 2,194 m (7,198 ft) and limited traffic capacity.

The new tunnel’s average elevation at 1,790 m (5,870 ft) is 400 m lower than the existing Jawahar tunnel’s elevation, which would make it less prone to avalanches and fulfills the dream of expressway between Srinagar and Banihal.

Tak said the tunnel is a masterpiece of engineering and has been constructed from Austrian tunneling method (ATM).

“The tunnel has been built on the Build Operate and Transfer Base System with a state of the art exhaust system to remove gas and bring in fresh air.”

He said 126 jet fans, 234 CCTV modern cameras and a firefighting system are being installed in both tubes of the tunnel for which the work is underway.

“A corridor between two tubes after every 500 meters inside the tunnel has been built and this can be used in case of any emergency in either tube,” Tak said.

The work on the tunnel was delayed for several reasons in the past 10 years and many deadlines were missed due to the unexpected land condition inside the tunnel, alleged financial crisis in the construction company and some issues related to local landlords and company workers, which led to a number of work shutdowns in the tunnel project.

Previous Post

Pak-based militant groups resort to cyber recruitment in J&K: Officials

Next Post

J&K records 182 new COVID-19 cases, one more death

Images News Netwok

Images News Netwok

Related Posts

CM, religious leaders, civil society members appeal for peace

CM, religious leaders, civil society members appeal for peace
March 5, 2026

    Srinagar: Chief Minister Omar Abdullah on Wednesday met with religious leaders and civil society members here to discuss...

Read moreDetails

Precautionary restrictions to continue on Thursday

‘Precautionary restrictions to remain in force across Kashmir on Tuesday’
March 5, 2026

Srinagar: Restrictions remained in force in parts of Kashmir for the third consecutive day on Wednesday as authorities continued preventive...

Read moreDetails

Court rejects ED’s plea to add fresh charges against Farooq Abdullah, five others JKCA ‘fund misappropriation’ case

City court convicts 2 persons in acid attack case
March 5, 2026

Srinagar: A court here on Wednesday rejected a plea by the Enforcement Directorate (ED) seeking to add fresh charges against...

Read moreDetails

Mehbooba Mufti slams Center, J&K govt’s silence over attack on Iran

Mehbooba questions ban on over 30 TV channels
March 5, 2026

Srinagar: Peoples Democratic Party (PDP) president Mehbooba Mufti on Wednesday said India's silence on the US-Israel aggression against Iran was...

Read moreDetails

Day temperatures soar across J&K, remain several degrees above normal: IMD

MeT predicts dry weather in Kashmir
March 5, 2026

Srinagar: Day temperatures across Jammu and Kashmir remained several degrees above normal on Wednesday, while no rainfall was recorded in...

Read moreDetails

Army to recruit 800 porters at Rajouri-Poonch sector for newly raised company

Maj Gen A P S Bal takes over as GOC of Delta force
March 5, 2026

Jammu:  Indian Army will conduct recruitment drives from March 12 to enrol 800 porters for its newly raised Porter Company,...

Read moreDetails
Next Post
COVID-19 rapid antibody test kit use put on hold, ICMR to check accuracy: Official source

J&K records 182 new COVID-19 cases, one more death

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.