• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, March 27, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Banihal-Qazigund Tunnel likely to complete by March

Images News Netwok by Images News Netwok
January 4, 2021
in TOP NEWS
A A
0
Banihal-Qazigund Tunnel likely to complete by March
FacebookTwitterWhatsapp

Banihal: The work on the double tube 8.5-km-long Banihal-Qazigund tunnel along the 270-km Jammu-Srinagar national highway is nearing completion and is likely to open for traffic in March.

The work on the Rs 2100-crore project started in June 2011 by Navyuga engineering company and on completion would reduce the road distance between Banihal in Jammu province and Qazigund in south Kashmir by 16 km from the present 35 km and will bypass Jawahar Tunnel and Shaitan Nalla, which is prone to heavy snowfall and slippery conditions during winters.

More News

Energy supply fully secure; govt debunks misinformation campaign

West Asia conflict: PM Modi to interact with CMs; review preparedness, plans

LG, CM thank PM, central leadership for additional central assistance

Load More

“The work within and outside is in the final stage and we are hopeful to throw it open for traffic in the last week of March,” Chief Manager, Navayuga Engineering Company, Muneeb Tak told PTI.

The existing road tunnel below the Banihal pass (Jawahar tunnel — the gateway to Kashmir) has been a bottleneck on the nearly 265-km highway, the only all weather road linking Kashmir with the rest of the country, due to its elevation of 2,194 m (7,198 ft) and limited traffic capacity.

The new tunnel’s average elevation at 1,790 m (5,870 ft) is 400 m lower than the existing Jawahar tunnel’s elevation, which would make it less prone to avalanches and fulfills the dream of expressway between Srinagar and Banihal.

Tak said the tunnel is a masterpiece of engineering and has been constructed from Austrian tunneling method (ATM).

“The tunnel has been built on the Build Operate and Transfer Base System with a state of the art exhaust system to remove gas and bring in fresh air.”

He said 126 jet fans, 234 CCTV modern cameras and a firefighting system are being installed in both tubes of the tunnel for which the work is underway.

“A corridor between two tubes after every 500 meters inside the tunnel has been built and this can be used in case of any emergency in either tube,” Tak said.

The work on the tunnel was delayed for several reasons in the past 10 years and many deadlines were missed due to the unexpected land condition inside the tunnel, alleged financial crisis in the construction company and some issues related to local landlords and company workers, which led to a number of work shutdowns in the tunnel project.

Previous Post

Pak-based militant groups resort to cyber recruitment in J&K: Officials

Next Post

J&K records 182 new COVID-19 cases, one more death

Images News Netwok

Images News Netwok

Related Posts

Energy supply fully secure; govt debunks misinformation campaign

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
March 27, 2026

New Delhi: The Ministry of Petroleum and Natural Gas on Thursday asserted that India’s fuel and gas supplies remain fully...

Read moreDetails

West Asia conflict: PM Modi to interact with CMs; review preparedness, plans

   PM Modi pitches for ‘swadeshi’ goods
March 27, 2026

New Delhi: Prime Minister Narendra Modi on Friday will interact with the chief ministers of all states, barring those which...

Read moreDetails

LG, CM thank PM, central leadership for additional central assistance

J&K leaders grieve plane crash deaths
March 27, 2026

Srinagar: Lieutenant Governor of J&K, Manoj Sinha and Chief Minister, Omar Abdullah have expressed gratitude to the Prime Minister and...

Read moreDetails

CM chairs Cabinet meet in Jammu, approves certain projects

CM chairs Cabinet meet in Jammu, approves certain projects
March 27, 2026

Jammu: Chief Minister Omar Abdullah chaired a Cabinet meeting this evening in Jammu, reviewing key development initiatives and governance priorities,...

Read moreDetails

Srinagar-Jammu highway remains closed

Traffic to remain suspended on Jmu-Sgr highway tomorrow night for repair work
March 27, 2026

Srinagar: In the wake of rains, Srinagar-Jammu National Highway (NH-44) continues to remain closed for vehicular movement between Karol Bridge...

Read moreDetails

Historic temple reopens after 36 years at Habba Kadal on Ram Navami, processions taken out

Historic temple reopens after 36 years at Habba Kadal on Ram Navami, processions taken out
March 27, 2026

Srinagar/Jammu: Ram Navami was celebrated with religious fervour across Jammu and Kashmir on Thursday, with devotees taking out ‘Shobha Yatras’...

Read moreDetails
Next Post
COVID-19 rapid antibody test kit use put on hold, ICMR to check accuracy: Official source

J&K records 182 new COVID-19 cases, one more death

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.