• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, January 30, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home NATION

Modi to lay foundation stone for new Parliament Building on Dec 10

Press Trust of india by Press Trust of india
December 6, 2020
in NATION
A A
0
Modi to lay foundation stone for new Parliament Building on Dec 10
FacebookTwitterWhatsapp

New Delhi:  Prime Minister Narendra Modi will lay the foundation stone on December 10 for a new Parliament building and the construction is expected to be completed by 2022 at an estimated cost of Rs 971 crore, Lok Sabha Speaker Om Birla said on Saturday.

“The existing temple of democracy is completing 100 years… It is a matter of pride for our countrymen that the new one will be built by our own people as a prime example of Aatmanirbhar Bharat,” Birla said here announcing details of the new proposed building.

More News

India emerging as ray of hope for world: PM Modi

SC puts new UGC regulations on hold, says can have ‘very sweeping consequences’

VB-G RAM G enacted in backdrop of notable decline in work demand under MGNREGS: Economic Survey

Load More

“The new building will showcase the cultural diversity of the country. Hopefully, in the 75th year of independence (2022), Parliament session will be held in the new building,” he said.

Birla said the new building will be earthquake resistant and 2000 people will be directly involved in the construction of the new building and 9,000 indirectly.

He said as many as 1,224 MPs can sit together in the building, while a new office complex for all MPs of both the houses would be built at the site of the existing Shram Shakti Bhawan.

The existing Parliament building will be conserved as it is an archaeological asset of the country, Birla said.

The existing building is a British era building, designed by Edwin Lutyens and Herbert Baker who were responsible for planning and construction of New Delhi.

The Foundation Stone of the existing Parliament House was laid on February 12, 1921 and the construction took six years and cost Rs 83 lakh at that time. The opening ceremony was performed on January 18, 1927 by the then Governor-General of India, Lord Irwin.

The new building will have an area of 64,500 square metres and is being built at an estimated cost of Rs 971 crore, Birla said.

He said the outlook of the new building will be similar to the existing one.

“There will be a basement, ground, first and second floors in the new building and its height will be same as the old building so that both should are in symmetry,” he said.

The Lok Sabha Speaker said the invitation will be extended to all political parties. While some would attend physically and others would attend virtually, Birla said, while adding that the ground laying ceremony at 1 pm on December 10 would follow all Covid-related guidelines.

As per rules, the speaker of the lower house of parliament is also the custodian of the parliament building.

Sufficient steps have been taken to control air and noise pollution during the construction work for the new parliament building, which will have separate offices for all MPs and those will be equipped with the latest digital interfaces as a step towards creating ‘paperless offices’.

The new building will also have a grand Constitution Hall to showcase India’s democratic heritage, a lounge for members of Parliament, a library, multiple committee rooms, dining areas and ample parking space.

In the new building, the Lok Sabha chamber will have a seating capacity for 888 members, while Rajya Sabha will have 384 seats for the upper house members.

This has been done keeping in mind the future increase in the number of members for the two houses.

At present, Lok Sabha has a sanctioned strength of 543 members and Rajya Sabha of 245.

In September this year, Tata Projects Limited won the bid to construct the new parliament building at a cost of Rs 861.90 crore. The new building will be constructed close to the existing one under the Central Vista redevelopment project.

The existing Parliament House building will be suitably retro-fitted to provide more functional spaces for parliamentary events, to ensure its usage along with the new building.

The existing building is a massive circular edifice of 560 feet in diameter. The Parliament House Estate is enclosed by an ornamental red sandstone wall or iron grills with iron gates that can be closed when occasions demand. The building has twelve gates.

Previous Post

Artists being ridiculed in the centre of the city

Next Post

India has potential to export Rs 8 lakh cr worth motherboards between 2021-26: Report

Press Trust of india

Press Trust of india

Related Posts

India emerging as ray of hope for world: PM Modi

Ease of justice must for all, language of law should be local, simple: PM Modi
January 29, 2026

New Delhi:  Prime Minister Narendra Modi on Thursday asserted that the country was emerging as a "ray of hope" for...

Read moreDetails

SC puts new UGC regulations on hold, says can have ‘very sweeping consequences’

SC says will consider listing of pleas challenging abrogation of Article 370
January 29, 2026

New Delhi:  In a significant development, the Supreme Court on Thursday stayed the recent UGC equity regulations on preventing caste-based...

Read moreDetails

VB-G RAM G enacted in backdrop of notable decline in work demand under MGNREGS: Economic Survey

India loves celebrating and recognising its diversity: Finance Minister Sitharaman
January 29, 2026

New Delhi:  Recent trends under the MGNREGS revealed a notable decline in work demand, and it was in this backdrop...

Read moreDetails

Maharashtra Dy CM Ajit Pawar, four others killed in plane crash in Pune

Maharashtra Dy CM Ajit Pawar, three others killed in plane crash in Pune
January 28, 2026

Baramati: Maharashtra Deputy Chief Minister Ajit Pawar and four other persons on board an aircraft were killed after it crashed...

Read moreDetails

  ‘Ajit dada’ made big contributions in development of Maharashtra, India: PM Modi

New criminal justice bills mark end of colonial-era laws, watershed moment in history: PM Modi
January 28, 2026

New Delhi:  Prime Minister Narendra Modi on Wednesday expressed grief over the death of Maharasthra Deputy Chief Minister Ajit Pawar...

Read moreDetails

Deepfakes significant threat to democracy: President Murmu

President Murmu inaugurates ‘Udyan Utsav 2023’; ‘Amrit Udyan’ to open for public Tuesday
January 28, 2026

New Delhi:  President Droupadi Murmu on Wednesday said deepfake and misinformation were becoming significant threats to democracy and social harmony,...

Read moreDetails
Next Post
India has potential to export Rs 8 lakh cr worth motherboards between 2021-26: Report

India has potential to export Rs 8 lakh cr worth motherboards between 2021-26: Report

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.