• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, November 21, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Advisor Bhatnagar reviews progress on PMDP projects for Comprehensive Flood Management

KI News by KI News
October 25, 2020
in LOCAL
A A
0
Advisor Bhatnagar reviews progress on PMDP projects for Comprehensive Flood Management
FacebookTwitterWhatsapp

SRINAGAR: Advisor to Lieutenant Governor, Rajeev Rai Bhatnagar, chaired a meeting to review progress on PMDP projects of Jal Shakti (I&FC) department for Comprehensive Flood Management works on river Jhelum here today.

The meeting was attended by Secretary Jal Shakti Department, M Raju; Chief Engineer Jal Shakti (I&FC) Kashmir, Ifthikar Ahmad Kakroo, Chief Engineer Jal Shakti (PHE) Kashmir, Iftikar Ahmad Wani and other senior officials of the department.

More News

CS Dulloo reviews progress of major highways and tunnels across J&K

Affiliation of 4 schools suspended, 8 imposed fine

LG Sinha meets MLA, receives Dogri books

Load More

Chairing the meeting, the Advisor asked the concerned officers for expeditious completion of all projects with timely submission of Utilization Certificates (UCs). He also asked for taking up necessary steps to give push to completion of pending works and provision of budgetary support in respect of the works which have already been executed.

During the meeting, the Advisor was informed that the PMDP project for Comprehensive Flood Management works on river Jhelum has been divided into two phases; Phase I and Phase II at the cost of Rs. 399.29 crore and Rs. 1684.60 crore respectively.

Giving details on achievements under Phase I, the Chief Engineer I&FC informed the meeting that Rs. 313.797 crore have been spent on different works besides other critical infrastructure. He further informed the meeting that under Phase I, the discharge carrying capacity of river Jhelum has been increased from 31800 cusecs to 41000 cusecs while as the carrying capacity of Flood Spill Channel (FSC) Padshahi Bagh has been increased from 4000 to 8700 cusecs. He revealed that re-sectioning at Bemina and Shariefabad of FSC has been completed while as the construction of two bridges at NaidKhai and Shariefabad on FSC is going on and will be completed within a month.

Addressing the officers, Advisor Bhatnagar stressed on them to maintain quality of works besides taking up proactive measures to make the flood management successful. He asked them to ensure that all the ongoing works are completed within the fixed timelines.

The Advisor directed the concerned officials to raise the embankments at all vulnerable spots besides carrying out dredging works at critical points to increase the carrying capacity of the river and FSC.

Advisor Bhatnagar further directed the officials to evolve an effective mechanism for controlling the soil erosion around the embankments besides formulating a long term plan for management of tributaries so as to reduce the impact of floods.

Previous Post

Chief Secretary greets people on Dussehra

Next Post

Rampant pollution in Wular Lake declines ‘Nadru’ production

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

CS Dulloo reviews progress of major highways and tunnels across J&K

Chief Secy calls for early screening and treatment to make J&K TB-free
by KI News
November 20, 2025

JAMMU: Chief Secretary Atal Dulloo today chaired a high-level meeting to review the status of major highway and road development...

Read moreDetails

Affiliation of 4 schools suspended, 8 imposed fine

JKBOSE issues revised date sheets for biannual, private exams
by KI News
November 20, 2025

SRINAGAR: The Jammu and Kashmir Board of School Education (J&K BOSE) has put the affiliation of 4 schools under suspension...

Read moreDetails

LG Sinha meets MLA, receives Dogri books

LG Sinha meets MLA, receives Dogri books
by KI News
November 20, 2025

JAMMU: Lieutenant Governor Manoj Sinha today held a series of meetings with public representatives, literary figures, and social delegations in...

Read moreDetails

Dr Farooq urges PM, HM, CMs to ensure safety of Kashmiris across India

Don’t divide this country on basis of religion: Farooq Abdullah to PM Modi
by KI News
November 20, 2025

Srinagar: The Jammu and Kashmir National Conference President Dr. Farooq Abdullah has urged the Prime Minister of India, the Union...

Read moreDetails

Div Com inaugurates ‘Know Your Artisan’ Craft Carnival

by KI News
November 20, 2025

Srinagar: Riding high on the resounding success of the first three ‘Know Your Artisan’ (KYA) events in October, which captivated...

Read moreDetails

Speaker JKLA receives Rasa Javedani Memorial Literary Award

by KI News
November 20, 2025

JAMMU: Speaker, Jammu and Kashmir Legislative Assembly (JKLA), Abdul Rahim Rather, today received the Rasa Javedani Memorial Literary Award 2025...

Read moreDetails
Next Post
Rampant pollution in Wular Lake declines ‘Nadru’ production

Rampant pollution in Wular Lake declines ‘Nadru’ production

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.