• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, April 12, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

5 areas in Bhadarwah pin hopes of road connectivity on PMGSY

Press Trust of india by Press Trust of india
October 19, 2020
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Bhadarwah: Around 10,000 people of five panchayats in Doda district are hopeful that their lives are going to change for better as authorities started macadamisation work on Dradhu-Manwa road under the Pradhan Mantri Grameen Sadak Yojana (PMGSY).

Being black-topped at an allotted cost of Rs 717 lakh, the 9.12 km Dradhu-Manwa road will provide all-weather connectivity to Dradhu, Diggi, Manwa, Sengoi and Misrata by the end of this month, officials said.

More News

Declaring war against drug trafficking, LG warns of asset seizure, Aadhaar cancellation, other penalties for involved

Just like we handled COVID, we can face West Asia crisis: Rajnath Singh

J&K Govt revamps GST framework

Load More

Villagers, especially fruit-growers of these five panchayats, known for producing the best quality of apples, pears, walnuts and parsimony, were waiting for the last one decade for completion of this road.

They heaved a sigh of relief as the authorities speeded up the pace of work under PMGSY after taking over the project from Roads and Building department in 2018.

After completing the earth work last week, the macadamisation of the Dradhu-Manwa road is in full swing and is expected to be completed by the end of October, the officials said.

PMGSY Bhaderwah recently started the second phase of work which includes soling, mettling and macadamisation by deploying heavy machinery.

“The black-topping of Dradhu-Manwa road has been taken up last week and we are hopeful of completing the second phase by October 31,” Assistant Executive Engineer, PMGSY Bhadarwah, Atta Mohammad Sheikh said.

After completion of the black-topping, he said this road would provide all-weather connectivity to five panchayats, benefiting 10,000 people.

“This road has the potential of boosting the life standard of the villagers, especially that of fruit and vegetable growers which is the main source of livelihood in this area,” he added.

The villagers are also upbeat over the work being undertaken at a brisk pace and are hopeful that the road will be finally completed in a stipulated time period.

“We waited for a long time and are now hopeful that finally this road will be completed and we will be able to transport our produce, especially fruits and vegetables in the markets hassle-free,” Riyaz Ahmed, a resident of Manwa village, said.

He said the better road connectivity would reduce transportation cost.

After lockdown restrictions were eased, the road construction has been taken up with renewed vigour, the officials said.

They said the government has, over the last five years, spent more than Rs 80,000 crore on building and upgrading rural roads across the country even as PMGSY funding model has changed.

Previous Post

Minor raped by relative in Kupwara: Police

Next Post

Thousands appear in written test for BSF jobs

Press Trust of india

Press Trust of india

Related Posts

Declaring war against drug trafficking, LG warns of asset seizure, Aadhaar cancellation, other penalties for involved

Declaring war against drug trafficking, LG warns of asset seizure, Aadhaar cancellation, other penalties for involved
April 12, 2026

Jammu: Asserting that the full force of law will be used to dismantle cross-border drug trafficking networks, Lt Governor Manoj...

Read moreDetails

Just like we handled COVID, we can face West Asia crisis: Rajnath Singh

BJP governments never imposed any ban on media organisations: Rajnath Singh
April 12, 2026

Lucknow:  Defence Minister Rajnath Singh on Saturday asserted that India is fully prepared to deal with any emergency situation and...

Read moreDetails

J&K Govt revamps GST framework

GST impacted J&K tourism negatively: Par panel
April 12, 2026

Srinagar: The Jammu and Kashmir government has introduced a series of amendments to the Goods and Services Tax (GST) framework...

Read moreDetails

Ladakh LG on maiden visit to Kargil, assures LAHDC of full cooperation

Vinai Kumar Saxena takes oath as 4th L-G of UT Ladakh
April 12, 2026

Leh:  Ladakh Lt Governor Vinai Kumar Saxena on Saturday reached Kargil on his maiden visit to the district and exhorted...

Read moreDetails

Wular Lake conservation restores 5 sq km area, 1.31 lakh trees removed in J&K

Wular Lake conservation restores 5 sq km area, 1.31 lakh trees removed in J&K
April 12, 2026

Jammu:  Conservation efforts at north Kashmir’s Wular Lake, one of Asia’s largest freshwater lakes and a crucial Ramsar site, have...

Read moreDetails

Govt directs SSSA rollout by May 2026

AC extends Amnesty Scheme-2022 for domestic consumers of electricity till March 2025
April 12, 2026

Srinagar: The government has directed the Jammu and Kashmir Board of School Education (JKBOSE) to ensure implementation of State School...

Read moreDetails
Next Post
Thousands appear in written test for BSF jobs

Thousands appear in written test for BSF jobs

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.