• About us
  • Contact us
  • Our team
  • Terms of Service
Saturday, April 4, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

China to construct 1,124-megawatt power project in Pak under CPEC

Press Trust of india by Press Trust of india
June 3, 2020
in TOP NEWS
A A
0
China to construct 1,124-megawatt power project in Pak under CPEC
FacebookTwitterWhatsapp

Islamabad:  China under the multi-billion-dollar CPEC will set up a 1,124-megawatt power project in Pakistan-administered-Kashmir despite India’s objection to it, according to a media report on Tuesday.

The details of the Kohala hydropower project was presented in the 127th meeting of the Private Power and Infrastructure Board (PPIB) chaired by Energy Minister Omar Ayub on Monday.

More News

Leadership is not only governance, but service: LG Sinha

J&K economic growth eases to 11.18% in FY25: CAG report

LG orders magisterial probe into Ganderbal encounter

Load More

The ‘Express Tribune’ reported that the meeting was informed that a tripartite agreement has been finalised among China’s Three Gorges Corporation, the authorities in Pakistan-administered-Kashmir (PaK) and the PPIB to implement the 1,124-megawatt Kohala hydroelectric power project under the China-Pakistan Economic Corridor (CPEC) framework.

The project will be built on the Jhelum River and aims at annually providing more than five billion units of clean and low-cost electricity for consumers in Pakistan.

The paper further reported that this marks one of the largest investments of USD 2.4 billion in an independent power producer (IPP) in the region.

The 3,000-km-long CEPC is aimed at connecting China and Pakistan with rail, road, pipelines and optical cable fiber networks. It connects China’s Xinjiang province with Pakistan Gwadar port, providing access to China to the Arabian Sea.

The CPEC passes through PaK, over which India has conveyed its protests to China.

Last month, India protested to Pakistan awarding a mega contract to build a dam in Gilgit-Baltistan, saying “carrying out of such projects in territories under Pakistan’s illegal occupation was not proper”.

The Pakistan government has signed a whopping Rs 442 billion contract with a joint venture of a Chinese state-run firm and a commercial arm of Pakistan’s powerful military for construction of the Diamer-Bhasha dam.

“Our position is consistent and clear that entire territory of the Union Territories of Jammu and Kashmir and Ladakh have been, are and will continue to be integral and inalienable part of India,” the Ministry of External Affairs said in New Delhi last month.

“We have consistently conveyed our protests and shared concerns with both Pakistan and China on all such projects in the Indian territories under Pakistan’s illegal occupation,” it said.

Ayub, a grandson of former military ruler Ayub Khan, in his remarks, lauded the infrastructure board for playing a crucial role in optimising hydroelectric power generation.

He said the government was determined to ensure long-term energy sustainability and reliability for which renewable energy, hydroelectric power and indigenous coal-based projects were being prioritised.

Previous Post

Family of COVID-19 victim flees with half-burnt body after mob attacks them in Jammu

Next Post

India, Pak troops trade fire along IB in Kathua, LoC in Poonch

Press Trust of india

Press Trust of india

Related Posts

Leadership is not only governance, but service: LG Sinha

Leadership is not only governance, but service: LG Sinha
April 4, 2026

Jammu: “Ayodhya is the cradle of civilisation and the eternal fountainhead of consciousness. When we invoke Ayodhya, we summon that...

Read moreDetails

J&K economic growth eases to 11.18% in FY25: CAG report

2018 nears its end, but CAG report yet to be made public in J&K
April 4, 2026

Jammu: Jammu and Kashmir's Gross State Domestic Product (GSDP) growth moderated to 11.18 percent in 2024-25, down from 12.51 percent...

Read moreDetails

LG orders magisterial probe into Ganderbal encounter

LG Sinha orders major crackdown on drug networks targeting youth
April 4, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Friday ordered a magisterial probe into the encounter in Ganderbal district in which one...

Read moreDetails

Political parties in Kashmir welcome Ganderbal encounter probe

KI News
April 4, 2026

Srinagar: Political parties in Kashmir on Friday welcomed the magisterial probe into the Ganderbal encounter, and expressed hope that a...

Read moreDetails

J&K High Court upholds rent fixation, dismisses tenant’s plea

PM Modi inaugurating incomplete projects for votes: JKPCC
April 4, 2026

Srinagar: The High Court of Jammu & Kashmir and Ladakh has held that a beneficiary of a government allotment cannot...

Read moreDetails

 Fuel, LPG supplies stable in J&K, says Oil Industry

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
April 4, 2026

Srinagar: Oil Marketing Companies on Friday said that adequate stocks of petrol, diesel and LPG are available across Jammu and...

Read moreDetails
Next Post
India, Pak troops trade fire along IB in Kathua, LoC in Poonch

India, Pak troops trade fire along IB in Kathua, LoC in Poonch

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.