• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, February 10, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

NHPC mulls 3 hydro power plants, 50 MW solar energy project in Ladakh

Press Trust of india by Press Trust of india
May 30, 2020
in TOP NEWS
A A
0
NHPC mulls 3 hydro power plants, 50 MW solar energy project in Ladakh
FacebookTwitterWhatsapp

Delhi, May 29 : State-run hydro power giant NHPC is mulling setting up three hydro power projects with a total capacity of 155 MW and a 50 MW solar energy project in the Union Territory of Ladakh.

NHPC would also explore the possibility of blending hydro power with solar energy in view of high solar irradiance in the region.

More News

LG Sinha orders all-out push to dismantle terror networks in J&K

SASCI row rocks J&K Assembly; heated exchanges force adjournment, BJP stages walkout

SEC post vacant, but ULB & panchayat polls soon: CM Omar Abdullah

Load More

NHPC Chairman and Managing Director A K Singh called on Lt Governor of UT of Ladakh R K Mathur on Friday at J&K Bhawan, New Delhi to discuss proposals and way forward on implementation of various identified hydro and solar power projects in the Leh-Ladakh region, according to a power ministry statement.

During the discussion, Singh intimated the Lt Governor about the achievement of NHPC in harnessing hydro power potential of Ladakh region by commissioning 45 MW Nimmo Bazgo in Leh and 44 MW Chutak hydro power projects in Kargil.

He also presented future plan of NHPC to develop three hydro power projects like Khalsi (80 MW), Kanyunche (45 MW) and Takmaching (30 MW) in Ladakh along with a solar power project of capacity 50 MW at Phyang.

While explaining the techno-commercial viability of projects, Singh proposed that taking advantage of high solar irradiance of the region, blending of hydro power with solar energy may also be explored, the statement said.

The Lt Governor appreciated the efforts made by NHPC in commissioning two hydro power projects and maintaining smooth operation and maintenance of these projects in spite of tough conditions.

He also encouraged NHPC to have an in depth analysis of techno-commercial viability of future projects and assured for all possible supports from UT of Ladakh in order to facilitate expeditious development of these power projects by NHPC.

Previous Post

COVID-19: Govt declares Dhara Harwan ‘Red-Zone’

Next Post

Forest fire triggers landmine blasts along LoC in Poonch

Press Trust of india

Press Trust of india

Related Posts

LG Sinha orders all-out push to dismantle terror networks in J&K

LG Sinha orders all-out push to dismantle terror networks in J&K
February 10, 2026

Jammu: Sending a strong security message, Lieutenant Governor Manoj Sinha on Monday asked the Jammu and Kashmir Police to launch...

Read moreDetails

SASCI row rocks J&K Assembly; heated exchanges force adjournment, BJP stages walkout

SASCI row rocks J&K Assembly; heated exchanges force adjournment, BJP stages walkout
February 10, 2026

 Jammu: The Jammu and Kashmir Legislative Assembly witnessed noisy scenes on Monday as a debate over the Special Assistance to...

Read moreDetails

SEC post vacant, but ULB & panchayat polls soon: CM Omar Abdullah

Omar Abdullah presents Rs 1.27 lakh cr budget, announces welfare/development measures to boost economy
February 10, 2026

Jammu: Chief Minister Omar Abdullah on Monday said elections to Urban Local Bodies (ULBs) and panchayats in Jammu and Kashmir...

Read moreDetails

‘J&K hydro power capacity to cross 7,300 MW in next five years’

‘J&K leading the charge in electricity sector reforms’
February 10, 2026

Jammu:  Jammu and Kashmir is set to witness a major expansion in its hydro power sector, with the combined installed...

Read moreDetails

Govt committed to providing electricity to all remote habitations: CM

No plan to create new administrative units, priority to operationalise existing ones: CM Omar
February 10, 2026

JAMMU: Chief Minister Omar Abdullah today said that with rising population, expansion of villages and new habitations coming up, it...

Read moreDetails

J&K jobless rate nearly double national average, House informed

Baba Reshi–Gulmarg Road DPR prepared; govt reiterates commitment to robust road connectivity: Deputy CM
February 10, 2026

 Jammu:  The unemployment rate in Jammu and Kashmir continues to remain significantly higher than the national average, Deputy Chief Minister...

Read moreDetails
Next Post
Forest fire triggers landmine blasts along LoC in Poonch

Forest fire triggers landmine blasts along LoC in Poonch

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.