• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, December 24, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt

Press Trust of india by Press Trust of india
April 27, 2020
in BUSINESS
A A
0
Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt
FacebookTwitterWhatsapp

New Delhi: The government on Sunday said the production capacity of PPE coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, with Bengaluru emerging as a major hub for its production.

“The PPE kits are being sent to states by the Ministry of Health as per requirement.

More News

RBI announces Rs 2 lakh crore OMO, $10 bn USD/INR swap to inject liquidity

VB-G RAM G Act better than MGNREGA, will transform rural India: Shivraj Chouhan

CEA says mindset that India’s data estimates being inferior needs to change

Load More

“Ministry of Health & Family Welfare, Department of Pharmaceuticals, and Ministry of Textiles are continuously working with various industry bodies, stakeholders and manufacturers on 24×7 basis, to streamline the supply chain, remove bottlenecks and maintain a steady supply of all materials required for the healthcare professionals,” an official statement said.

Production capacity of coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, it added.

Nearly fifty per cent of the coverall production in the country is from Bengaluru.

Other than Bengaluru, PPE coveralls are also being manufactured by approved production units in Tirupur, Chennai and Coimbatore in Tamil Nadu, Ahmedabad and Vadodara in Gujarat, Phagwara and Ludhiana in Punjab, Kusumnagar and Bhiwandi in Maharashtra, Dungarpur in Rajasthan, Kolkata, Delhi, Noida, Gurugram and few other places.

“The cumulative production till date is approximately one million coverall units,” the statement issued by the Textile Ministry said.

Body coveralls (PPE) have a stringent technical requirements as prescribed by the Ministry of Health & Family Welfare since it is a specialized protective suit meant for high level of protection to health professionals.

HLL Lifecare Limited is the designated single-window procurement agency for the hospitals and healthcare organisations under the Ministry of Health & Family Welfare.

In the last week of January 2020, the technical standard for the coveralls was prescribed as per WHO class-3 exposure pressure in accordance with ISO 16003 or its equivalent.

“Such materials were being manufactured by a few international companies, who expressed their inability to supply on account of a complete glut in stocks and ban of exports by the source countries. Only a limited quantity was offered and procured by the procurement organization of the Ministry of Health & Family Welfare,” the statement said.

The health ministry finalised the technical requirement on March 2, based on the indigenous availability of materials and the technical requirement for a high level of protection of the healthcare professionals who would deal with the COVID-19 cases, in consultation with medical experts in the field.

The specification was published on the official website of HLL Lifecare Ltd on 5 March 2020, inviting manufacturers having adequate capability to participate in the procurement process.

As of now, there are four laboratories in the country which have the Synthetic Blood Penetration Resistance Test facilities as well as necessary approvals for conducting tests and certification for Body Coveralls (PPE) required for COVID-19.

These are – South India Textiles Research Association (SITRA), Coimbatore, Defence Research and Development Establishment (DRDE), Gwalior, and two laboratories under Ordnance Factory Board – Heavy Vehicles Factory, Avadi and Small Arms Factory, Kanpur.

Previous Post

COVID-19 cases in Wuhan hospitals drop to zero for 1st time: official

Next Post

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Press Trust of india

Press Trust of india

Related Posts

RBI announces Rs 2 lakh crore OMO, $10 bn USD/INR swap to inject liquidity

RBI holds meeting of Steering Sub Committee of J&K SLBC
by Press Trust of india
December 23, 2025

Mumbai:  The Reserve Bank of India on Tuesday said it will purchase government securities worth Rs 2 lakh crore and...

Read moreDetails

VB-G RAM G Act better than MGNREGA, will transform rural India: Shivraj Chouhan

Centre to set up Clean Plant facility to provide disease-resistant plants to horticulturists in Kashmir
by Press Trust of india
December 23, 2025

Jaipur:  Union Agriculture and Farmers Welfare Minister Shivraj Singh Chouhan on Tuesday said that the Viksit Bharat-G Ram G Act...

Read moreDetails

CEA says mindset that India’s data estimates being inferior needs to change

by Press Trust of india
December 23, 2025

New Delhi:  All estimate methodologies have some limitations, but the mindset that India's methods for estimating GDP are inferior needs...

Read moreDetails

India, New Zealand conclude FTA talks; pact to offer duty-free access, USD 20 bn FDI

India, New Zealand conclude FTA talks; pact to offer duty-free access, USD 20 bn FDI
by Press Trust of india
December 22, 2025

New Delhi:  India and New Zealand on Monday announced the conclusion of talks for a free trade agreement that will...

Read moreDetails

Vaishnaw should resign over Railways deterioration: Congress after train fare hikes

Govt bringing laws, taking steps to make social media platforms accountable: IT Min
by Press Trust of india
December 22, 2025

New Delhi:  The Congress on Monday demanded the resignation of Railway Minister Ashwini Vaishnaw, claiming that under him, the condition...

Read moreDetails

Gold jumps to record high of Rs 1.38 lakh/10g, silver hits new peak of Rs 2,14,500 per kg

by Press Trust of india
December 22, 2025

New Delhi:  Gold prices rose to a fresh lifetime high of Rs 1,38,200 per 10 grams, gaining Rs 1,685, in...

Read moreDetails
Next Post
Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.