• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, March 3, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt

Press Trust of india by Press Trust of india
April 27, 2020
in BUSINESS
A A
0
Production capacity of PPE coveralls ramped up to over 1 lakh per day: Govt
FacebookTwitterWhatsapp

New Delhi: The government on Sunday said the production capacity of PPE coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, with Bengaluru emerging as a major hub for its production.

“The PPE kits are being sent to states by the Ministry of Health as per requirement.

More News

Modi-Carney talks: India, Canada seal landmark uranium deal; set USD 50 bn trade target

Oil prices rise sharply after attacks in Middle East disrupt global energy supply

India reviews fuel supplies amid Middle East tensions

Load More

“Ministry of Health & Family Welfare, Department of Pharmaceuticals, and Ministry of Textiles are continuously working with various industry bodies, stakeholders and manufacturers on 24×7 basis, to streamline the supply chain, remove bottlenecks and maintain a steady supply of all materials required for the healthcare professionals,” an official statement said.

Production capacity of coveralls required by medical personnel treating COVID-19 cases in the country has been ramped up to more than 1 lakh per day, it added.

Nearly fifty per cent of the coverall production in the country is from Bengaluru.

Other than Bengaluru, PPE coveralls are also being manufactured by approved production units in Tirupur, Chennai and Coimbatore in Tamil Nadu, Ahmedabad and Vadodara in Gujarat, Phagwara and Ludhiana in Punjab, Kusumnagar and Bhiwandi in Maharashtra, Dungarpur in Rajasthan, Kolkata, Delhi, Noida, Gurugram and few other places.

“The cumulative production till date is approximately one million coverall units,” the statement issued by the Textile Ministry said.

Body coveralls (PPE) have a stringent technical requirements as prescribed by the Ministry of Health & Family Welfare since it is a specialized protective suit meant for high level of protection to health professionals.

HLL Lifecare Limited is the designated single-window procurement agency for the hospitals and healthcare organisations under the Ministry of Health & Family Welfare.

In the last week of January 2020, the technical standard for the coveralls was prescribed as per WHO class-3 exposure pressure in accordance with ISO 16003 or its equivalent.

“Such materials were being manufactured by a few international companies, who expressed their inability to supply on account of a complete glut in stocks and ban of exports by the source countries. Only a limited quantity was offered and procured by the procurement organization of the Ministry of Health & Family Welfare,” the statement said.

The health ministry finalised the technical requirement on March 2, based on the indigenous availability of materials and the technical requirement for a high level of protection of the healthcare professionals who would deal with the COVID-19 cases, in consultation with medical experts in the field.

The specification was published on the official website of HLL Lifecare Ltd on 5 March 2020, inviting manufacturers having adequate capability to participate in the procurement process.

As of now, there are four laboratories in the country which have the Synthetic Blood Penetration Resistance Test facilities as well as necessary approvals for conducting tests and certification for Body Coveralls (PPE) required for COVID-19.

These are – South India Textiles Research Association (SITRA), Coimbatore, Defence Research and Development Establishment (DRDE), Gwalior, and two laboratories under Ordnance Factory Board – Heavy Vehicles Factory, Avadi and Small Arms Factory, Kanpur.

Previous Post

COVID-19 cases in Wuhan hospitals drop to zero for 1st time: official

Next Post

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Press Trust of india

Press Trust of india

Related Posts

Modi-Carney talks: India, Canada seal landmark uranium deal; set USD 50 bn trade target

Modi-Carney talks: India, Canada seal landmark uranium deal; set USD 50 bn trade target
March 2, 2026

New Delhi:  India and Canada on Monday sealed key pacts on supplies of Uranium and critical minerals and vowed to...

Read moreDetails

Oil prices rise sharply after attacks in Middle East disrupt global energy supply

Iran Crisis: No immediate oil disruption for India; Russia pivot possible if conflict drags on
March 2, 2026

New York: Oil prices rose sharply Monday as US and Israeli attacks on Iran and retaliatory strikes against Israel and...

Read moreDetails

India reviews fuel supplies amid Middle East tensions

March 2, 2026

New Delhi:  As military conflict in the Middle East escalates, India's Oil Ministry on Monday said it is continuously monitoring...

Read moreDetails

CAD widens to USD 13.2 bn in Q3 on higher trade deficit: RBI

March 2, 2026

Mumbai:  India's current account deficit (CAD) rose to USD 13.2 billion, or 1.3 per cent of GDP, in the December...

Read moreDetails

Centre’s goal is to develop TN, says PM inaugurating Rs 4,400 cr projects in Madurai

Ease of justice must for all, language of law should be local, simple: PM Modi
March 1, 2026

Madurai:  Prime Minister Narendra Modi on Sunday said the Centre's "collective goal" was a developed Tamil Nadu for a developed...

Read moreDetails

Iran Crisis: No immediate oil disruption for India; Russia pivot possible if conflict drags on

Iran Crisis: No immediate oil disruption for India; Russia pivot possible if conflict drags on
March 1, 2026

New Delhi: With crude inventories sufficient to meet at least 10 days of requirements and fuel stocks covering another 5-7...

Read moreDetails
Next Post
Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

Hope PM puts out comprehensive plan to deal with post-lockdown situation at meeting with CMs: Cong

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.