• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, August 29, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

DC Kargil takes stock of ongoing work on Parkachik Khawos Irrigation Canal

Images News Netwok by Images News Netwok
August 3, 2019
in LOCAL
A A
0
Promotions in PWD; 5 SEs placed as CE’s
FacebookTwitterWhatsapp

KARGIL AUGUST 02: Deputy Commissioner and CEO, LAHDC Kargil Baseer ul Haq Choudhary on Thursday took stock of the ongoing works on the construction of water conductor tunnel of the Parkachik Khawos irrigation canal.

The 900 metre span tunnel is being constructed at cost of Rs 720 lacs.

Related posts

Satish Sharma visits flood-affected areas of Chamb constituency

Satish Sharma visits flood-affected areas of Chamb constituency

August 28, 2025
Javed Rana reviews water supply restoration measures in flood-affected areas of Jammu city

Javed Rana reviews water supply restoration measures in flood-affected areas of Jammu city

August 28, 2025

The engineers of Irrigation and Flood Control (I&FC) Kargil informed the DC that work on the construction of 18 kilometers canal has been completed up to 12 kilometers and the remaining works including the construction of tunnel is expected to be completed by next year.

The engineers further informed that the irrigation canal would provide irrigational facilities to 2262 hectares of command area encompassing Parkachik, Parkachik Goma, Thulus, Pursa, Namsuru, Khawos, Kochik and other adjoining villages

The DC directed the concerned engineers to complete the remaining work within the stipulated period of time. He also stressed on proper maintenance of quality and quantity parameters in execution of the project.

Earlier, the DC also met a number of public delegations a Shagar, Lungmur Himiling and other adjoining villages of Zanskar Sub Division where people projected their issues and demands which included the augmentation of water and power supply, repair of irrigation canals and other related demands.

The DC assured the delegations that all their genuine demands would be given due consideration and steps for fulfillment would be taken up in a phased manner.

Meanwhile, the DC also visited Summer Grazing Camp at Shapath Nallah and took stock of its overall functioning. Responding to the requirement of livestock shelter shed and staff quarters, allotment of land and grazing rights at Shapath Nallah, the DC assured the concerned that appropriate measures would be taken in this regard.

CMO, CEO, Executive Engineer I&FC, ACD, District Social Welfare Officer, AD Tourism, AD Information besides other concerned officers accompanied the DC during the tour.

Previous Post

Afghan official: Taliban strike police checkpoint, kill 10

Next Post

Road Safety Fund Action Plan 2019-20 approved

Images News Netwok

Images News Netwok

Next Post
Road Safety Fund Action Plan 2019-20 approved

Road Safety Fund Action Plan 2019-20 approved

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.