• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, August 29, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Baig reviews progress of CSS in Power sector at B’la

Images News Netwok by Images News Netwok
January 22, 2019
in LOCAL
A A
0
Baig reviews progress of CSS in Power sector at B’la
FacebookTwitterWhatsapp

BARAMULLA, JANUARY 21: Member Parliament, Muzaffar Hussain Baig has asked officers to be proactive and ensure that the people are provided with all essential services including power supply particularly during these hard days of winter.

He was speaking during officers meeting at Dak Bungalow Baramulla today. The meeting was convened to review the status of Centrally Sponsored Schemes in Power Sector under execution in Baramulla district

Related posts

Satish Sharma visits flood-affected areas of Chamb constituency

Satish Sharma visits flood-affected areas of Chamb constituency

August 28, 2025
Javed Rana reviews water supply restoration measures in flood-affected areas of Jammu city

Javed Rana reviews water supply restoration measures in flood-affected areas of Jammu city

August 28, 2025

District Development Commissioner Baramulla Dr Nasir Ahmad Naqash, Chief Engineer project wing Srinagar Naseer Ahmad, Director Planning A G Malik, Superintending and Executive Engineers of power development department were present in the meeting.

Threadbare discussion was held on the schemes which include SAUBHAGYA, PMDP, PMDP Rural, DDUGJY, RAPDRP, IPDS, PMDP urban and other schemes.

The meeting was informed that Rs 108.82 crore is being expended under SAUBHAGYA in Baramulla and Kupwara districts, of which Rs 15.38 crore are to be incurred in Baramulla for electrifying 10712 households.

Reviewing the progress of PMDP, it was given out that all the works taken up under the jurisdiction of EM & RE circle Sopore have almost completed and charged. Major works which are to be done under PMDP rural, including 292 New 11/0.4 KV Distribution sub stations (140 in priority), new 11 KV transmission lines on 87 kms in the district. Rs.27.30.crore have been sanctioned for this purpose, the meeting added. As many as 2513 PL families out of 2636 will be benefitted in the first phase.

It was given out that various works at a cost of Rs 37.26 crore have been carried out under DDUGJY and PMDP-rural to cover 221 habitations in phase 1st.

Previous Post

GoC 26 Div meets Governor

Next Post

NHM employees protest in Ganderbal

Images News Netwok

Images News Netwok

Next Post
NHM employees protest in Ganderbal

NHM employees protest in Ganderbal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.