• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, April 2, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Steps afoot to provide uninterrupted electricity supply to consumers: Div Com

Images News Netwok by Images News Netwok
October 13, 2018
in LOCAL
A A
0
Steps afoot to provide uninterrupted electricity supply to consumers: Div Com
FacebookTwitterWhatsapp

SRINAGAR, OCTOBER 12: The Divisional Commissioner Kashmir Baseer Ahmad Khan today reiterated that necessary steps are afoot to provide better and uninterrupted electricity supply to the valley consumers.

The Divisional Commissioner made these remarks while chairing a meeting regarding ROW (right on way) and construction of transmission lines of Power Grid Corporation of India Limited (PGCIL).

More News

Couple chargesheeted under UAPA for posting objectionable content on social media

LG chairs meeting to discuss SKUAST-J & IFPRI collaboration for agri transformation in J&K

CM Abdullah assures review of Public Service Guarantee Act

Load More

The meeting was informed that the power transmission lines associated with Kishenganga Hydro Electric Power are running from Baramulla-Budgam-Pulwama districts under Double and Multi-Circuit power transmission lines with 75 Kms of length. The total cost of Double and Multi-Circuit power transmission lines project is Rs 150 crore. The Multi-Circuit power transmission line was already completed which are providing better electricity supply to north Kashmir areas. The double circuit power transmission line which is passing from Amargarh Sopore-Wagoora Budgam including some areas of Pulwama district is under progress.

The Divisional Commissioner stressed on completion of the transfer of land to the PGCIL on expedited mode.

He directed concerned District Collectors (Land Acquisition) to complete the Private Negotiation Committee (PNC) with land and structure owners, regarding proper compensation of their properties, within a week. No compensation will be provided to the Corridor side (down side area where power transmission line is passing). In case the land owners do not agree, then Compulsory mode of acquisition will be adopted without further delay so that the construction work on double circuit power transmission line did not get delayed.

Khan also asked concerned Deputy Commissioner to send the complete report to the Divisional Commissioner’s office within seven days of time for further action.

He stressed upon the revenue officers, engineers of PDD and PGCIL to work with better coordination, added zeal and in synergy with the concerned Deputy Commissioners so that the bottlenecks, if any other, in this project are removed immediately for the benefit of large chunk of population so that round the clock electricity will be provided to the consumers.

Deputy Commissioner Budgam, Dr Syed Sehrish Asgar participated the meeting through video conferencing whereas GM PGCIL, SDM Chadoora, Collector PDD, Assistant Commissioner and other engineers were present in this meeting.

Previous Post

4 months on, Lawaypora Bala village in Kulgam district without electricity

Next Post

Commissioner Secy Forest calls on Governor

Images News Netwok

Images News Netwok

Related Posts

Couple chargesheeted under UAPA for posting objectionable content on social media

Police produces chargesheet in Bemina terrorist attack case
April 2, 2026

Srinagar: A husband-wife duo, accused of spreading “false and distorted narratives on social media regarding the situation in Kashmir at...

Read moreDetails

LG chairs meeting to discuss SKUAST-J & IFPRI collaboration for agri transformation in J&K

SMVDSB takes major decisions to transform Vaishno Devi shrine, boost pilgrim facilities and local economy
April 1, 2026

Jammu: Lieutenant Governor Manoj Sinha on Wednesday chaired a high-level meeting to discuss a strategic collaboration between SKUAST Jammu and...

Read moreDetails

CM Abdullah assures review of Public Service Guarantee Act

Omar Abdullah flags glacial lake flood threat, announces subsidy relief and financial measures in Assembly
April 1, 2026

Jammu: Chief Minister Omar Abdullah on Wednesday opposed a private member's bill seeking changes to the Public Service Guarantee (PSG)...

Read moreDetails

Members withdraw bills after govt assurances; two bills rejected in Assembly

Speaker calls for comprehensive law to combat fake news, misinformation
April 1, 2026

Jammu: Several legislators on Wednesday withdrew their private members’ bills in the Jammu and Kashmir Legislative Assembly after receiving assurances...

Read moreDetails

Restoration project worth Rs 3 cr approved for flash flood–damaged Brakpora–Kanganhal–Chitergul road: Dy CM

No structural deficiency or safety concern on Sopore Bye-pass Bridge: Deputy CM
April 1, 2026

JAMMU: Deputy Chief Minister Surinder Kumar Choudhary today informed the House that the road stretch at Brakpora–Kanganhal–Chitergul suffered extensive damage...

Read moreDetails

Govt realizes over ₹3.83 cr under CA, NPV for Srinagar–Baramulla Highway diversion: Javed Rana

April 1, 2026

Jammu: An amount of over Rs. 3.83 crore has been realized under Compensatory Afforestation (CA) and Net Present Value (NPV)...

Read moreDetails
Next Post
Raj Bhawan will be people’s house: Satya Pal Malik

Commissioner Secy Forest calls on Governor

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.