Images News Netwok

Power shutdown

Decrease Font Size Increase Font Size Text Size Print This Page

JAMMU DECEMBER 13: To execute work for Branch cutting and tightening of jumpers, the shutdown of 11KV feeder TRN-3 emanating from 2 x10 MVA 33/11 kV R/Stn Trikuta Nagar is being observed.

During the shutdown, the power supply to Sector-2 & 2-Extn in Trikuta Nagar and its adjoining areas   will remain affected on December 14 from 10 am to 12 noon.

Meanwhile, for replacement of 33 KV isolator and 33 KV LA set by M/s IRCON International Ltd, the shutdown of 33 KV Janipur-Sheetli Line is being observed.

During the shutdown, the power supply to Sheetli, Sidhra, Bamyal, MES Sheetli, PHE Sheetli and adjoining areas will remain affected on December 14 from 12 noon to 3 pm.

However, to carry out work for branch cutting of 33 KV line from Salehat to Sai, the shutdown of 33 KV Salehar-Sai Tap in emanating from Salehar is being observed.

During the shutdown, the power supply to Sai, Bilaspur and its adjoining areas will remain affected on December 15 from 10 am to 3 pm.

However, for replacement of CT/PT unit of M/s Kashmir Ispat, SIDCO Complex, Bari Brahmana, the shutdown of 33/11 KV feeder is being observed.

During the shutdown, the power supply to Industrial Complex Bari Brahmana will remain affected on December 14 from 1.30 pm to 2 pm and 5.30 pm to 6 pm.

Leave a Reply

Your email address will not be published. Required fields are marked *